Installation - Sony HDR-PJ800 Service Manual

Digital hd video camera recorder
Hide thumbs Also See for HDR-PJ800:
Table of Contents

Advertisement

(17) Remove the two screws and remove the two bosses to detach the
Sheet Metal (A).
Peel off the Polyimide Sheet.
P
T O
Bosses
Polyimide Sheet
Sheet Metal (A)
Screw
(18) Disconnect the connector and peel off the adhesive part of the LF-
2063 Flexible Board.
Adhesive part
LF-2063 Flexible Board
P
T O
Connector
(19) Remove the two screws and remove the CM-1007 Board, Seal
Rubber, Optical Filter Block from the Lens Device (LSV-1400B).
P
T O
Optical Filter Block
Seal Rubber
CM-1007 Board
Lens Device (LSV-1400B)
Screw
Screw
HDR-PJ800/PJ810/PJ810E/PJ820/PJ820E_L2

Installation

(1) Install the Optical Filter Block, Seal Rubber, CM-1007 Board to the
Lens Device (LSV-1400B), and then tighten two screws in the order
shown in the figure below.
Tightening torque = 0.13 ± 0.01N · m (1.3 ± 0.1kg f · cm)
T O
Optical Filter Block
(Note)
Optical Filter Block
Seal Rubber
CM-1007 Board
Screw
1
Screw
2
Screw
Note :
Refer to Assembly-3: How to distinguish the side of
Optical Filter Block facing to Lens Device. .
(2) Connect the connector of the LF-2063 Flexible Board and stick the
adhesive part of the Flexible Board.
If the adhesive force is lowered, cut the Adhesive Sheet as shown
in the figure in the frame and then stick it.
Adhesive part
LF-2063 Flexible Board
P
T O
Connector
Shape and sticking position
of the Adhesive Sheet
Adhesive Sheet
LF-2063 Flexible Board
(3) Stick the Polyimide Sheet.
While attaching the two bosses, install the Sheet Metal (A), and then
tighten two screws in the order shown in the figure below.
Tightening torque = 0.12 ± 0.01N · m (1.2 ± 0.1kg f · cm)
Bosses
Polyimide Sheet
P
Lens Device (LSV-1400B)
(4) Stick the adhesive part of the LF-2026 Flexible Board to the Sheet
Metal (D-Sub) while positioning it with the two holes.
If the adhesive force is lowered, cut the Adhesive Sheet as shown
in the figure in the frame and then stick it.
Adhesive part
Sheet Metal (D-Sub)
1-8
(5) Connect the connector of the Flexible Board of the Lens Device
(LSV-1400B).
Install the LF-2026 Flexible Board, Sheet Metal (D-Sub).
Flexible Board of the Lens Device (LSV-1400B)
P
T O
Sheet Metal (D-Sub),
LF-2026 Flexible Board
Sheet Metal (A)
1
Screw
(6) While attaching the boss and the claw, install the Front Ornament,
Screw
2
and then tighten three screws in the order shown in the figure below.
Screw (A)
Tightening torque = 0.12 ± 0.01N · m (1.2 ± 0.1kg f · cm)
Screw (B)
Tightening torque = 0.18 ± 0.02N · m (1.8 ± 0.2kg f · cm)
LF-2026 Flexible Board
Front Ornament
Shape and sticking position
Holes
of the Adhesive Sheet
Adhesive Sheet
LF-2026 Flexible Board
– ENGLISH –
Connector
Boss
P
T O
3
2
Screw (B)
Screw (B)
1
Screw (A)
Claw

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hdr-pj810Hdr-pj810eHdr-pj820Hdr-pj820e

Table of Contents