7.4 Installing the RRU on Angle Steel
This section describes the procedure for installing the RRU on angle steel and the precautions
that must be taken during the installation. The RRU installed on angle steel can be mounted to
a tower or placed on the ground. It is recommended that only one RRU be installed on angle
steel.
Prerequisites
Before you install an RRU on a tower, the RRU and mounting kits are hoisted onto the tower.
For details, see
The hoist clamp on the main mounting bracket is secured properly.
Context
Figure 7-28
Figure 7-28 Top view of the RRU
(1) Angle steel
Procedure
Step 1 Determine a position for installing the main mounting bracket.
l
l
Issue 06 (2012-04-16)
6.1 Hoisting an RRU onto a
shows the top view of the RRU installed on angle steel.
If the RRU must be installed on a tower, see
RRU
to determine a position.
If the RRU must be installed on the ground, see
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Tower.
3.5.1 Installation Clearance for a Single
Figure 7-29
to determine a position.
7 Installing the RRU