GEDA 1500z Original Operating Manual page 70

Construction hoist/transport platform
Table of Contents

Advertisement

Operation
Ascent
 Press and hold the UP button (3).
The load platform only moves whilst
the button UP (3) is pressed.
Stopping ascent
 Release the UP button (3).
Descent
 Press the DOWN button (4) and keep it
pressed.
The platform only moves while you keep
pressing the DOWN button (4).
1 = EMERGENCY STOP button
Stopping descent
 Release the DOWN button (4).
The platform descends and automatically stops above the lower safety
area (about 2 m above the ground).
 Again press and hold the DOWN button (4).
 The system issues an alarm signal and after about 3 seconds, the
platform starts up and stops at the DOWN limit switch.
Operating Manual
WARNING
The installation personnel can only continue travel after
ensuring that the path of travel downwards is clear.
70 / 84
®
GEDA
1500 Z/ZP
1
3
4
BL076 GB Edition 07.2015

Advertisement

Table of Contents
loading

Related Products for GEDA 1500z

This manual is also suitable for:

1500zp

Table of Contents