Installation - Smeg T-9309-B Instruction Manual

Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION

This Hood is set up to be fitted inside the kitchen unit in:
• Ducting version:
• Recirculation version:
• Drilling the Support Surface and Fitting the Hood
• Connections
• Functional Check
• Disposal of Packaging
IMPORTANT
The minimum distance between the opening for the hob and the one for the hood must be of at
least 3-5 cm according to the strength of the material used for the working top.
EN
Evacuation to the outside.
Internal recirculation.
Sequence of operations - Installation
Drilling the Support Surface
8
8

Advertisement

Table of Contents
loading

Table of Contents