Diagram; Fig 14 - Processes And Instrumentation - York YCAV0267E Installation Operation & Maintenance

Air-cooled screw liquid chillers
Table of Contents

Advertisement

TECHNICAL DATA
PROCESSES AND INSTRUMENTATION DIAGRAM
SMV
FT
SMV
SYSTEM COMPONENTS
SMV
STEPPER MOTOR VALVE
S
SOLENOID VALVE
BALL VALVE
RELIEF VALVE
STOP VALVE ANGLE, ACCESS
P
PRESSURE SENSOR
T
TEMPERATURE SENSOR
REPLACEABLE CORE FILTER/DRYER
SIGHT GLASS
FLOW SWITCH (optional)
FS
PRESSURE SWITCH
PS
ELECTRIC HEATER
HTR
PLUG
FIG. 14 - PROCESSES AND INSTRUMENTATION DIAGRAM
168
Z
OIL COOLER COIL
CONDENSOR COIL
T
Z
AIR
S
FLOW
DV
P
LPC
COMP
HTR
T
EVAPORATOR
T
DV
CHT
LTC
FS
CHILLER WATER
FLOW
MAJOR COMPONENTS
COMP
COMPRESSOR
OS
OIL
SEPARATOR
FT
FLASH TANK
M
MUFFLER
Z
DV
HTC
LTC
OS
PS
T
P
DV
DIF
P
DV
HPC
M
HPL
DPF
HTR
T
DV
MICROPROCESSOR CONTROL FUNCTIONS
CHT
CHILLED LIQUID THERMOSTAT
DP
DIFFERENTIAL PRESSURE CUTOUT
DFP
DISCHARGE PRESSURE FAN CONTROL
DV
DISPLAY VALUE
HPL
HIGH PRESSURE LOAD LIMITING
HTC
HIGH TEMPERATURE CUTOUT
LPC
LOW PRESSURE CUTOUT
LTC
LOW TEMPERATURE CUTOUT
HPC
HIGH PRESSURE CUTOUT
HTR
HEATER
FORM 201.21-NM3 (616)
LD10589a
JOHNSON CONTROLS

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents