Start-up and installation
2.2
Device description
Fig. 2.1: Operating and control elements on the front of the HomeServer
Control elements on the front of the HomeServer and FacilityServer:
–
operating LED that lights up when the device is switched on.
Operating element on the front of the FacilityServer:
–
Reset button: The FacilityServer is restarted without power interruption.
i
Note: The HomeServer is switched on via the ON/OFF switch.
If the HomeServer is switched on via the ON/OFF switch, three double signal tones are
heard after at least 20 seconds. Only then is the HomeServer ready for operation. This must
be observed mainly with data transfer from the Expert software, as transfer of data is only
possible after the three double signal tones.
The operational readiness of the HomeServer is also signalled via three double tones after
programming and updating the firmware via the start-up cable.
Please note that the time period for the start of the HomeServer may significantly increase
depending on project size (how many KNX/EIB objects must be scanned). Over 4 minutes
are possible.