Summary of Contents for Global Industrial RXHS-361872
Page 1
Some parts may have sharp edges. CARE must be taken when handling various pieces to avoid injury. For safety, wear a pair of work gloves when assembling or performing any maintenance on the unit. Global Industrial, 111 Harbor Park Dr., Port Washington, NY 11050 • (800) 645-1232 • service@globalindustrial.com...
Page 2
ASSEMBLY OF HEAVY-DUTY HIGH CAPACITY SHELVING Two people are recommended for assembly. Approximate assembly time: 35-45 minutes per section. The reference numbers used throughout this sheet refer to the illustration on the back cover. This is to help you to identify the various parts as they are mentioned. With help from an associate, or using a wall for support, Attach one front-to-back center shelf supports (Ref.
Page 3
Attach shelf supports at the next desired shelf level. Attach the remaining shelf supports and decking at the Once the shelf supports are in place, attach a front-to-back desired shelf levels, completing one level at a time. center supports as you did in step 3. Lower the steel decking into place, as described in step 4.
Page 4
” Bolts and Nuts AVAILABLE LOCALLY * SUR-hh, where “-hh” indicates height of the upright post. Example: a 72” upright post for RXHS-361872 would be “SUR-72” NOTE: Additional hardware may be included for replacement purposes. NOTE: Additional hardware may be included for replacement purposes.
This manual is also suitable for:
Rxhs-361884Rxhs-362472Rxhs-362484Rxhs-362496Rxhs-481872Rxhs-481884...
Show all
Need help?
Do you have a question about the RXHS-361872 and is the answer not in the manual?
Questions and answers