Start Up And Operation; Instrument Start-Up - ABB Industrial enabled Analyzer 9437 Instruction Manual

Low and high level dissolved oxygen monitor
Table of Contents

Advertisement

6 START UP AND OPERATION

6.1 Instrument Start-up – Fig. 6.1
Ensure all electrical connections have been made and switch on the power supply. If the instrument is being commissioned for
the first time, calibration and programming of parameters is required.
The overall operating and programming chart is shown in Fig. 6.1.
Operating Page
Start
– – – – –
µg/kg
D.O.
– – – – –
Temperature
1 5 0
Alarm 1 Setpoint
5 0
Alarm 2 Setpoint
Electrical Calibration Page
– – – – –
ELECTRICAL CAL
– – – – –
Calibrate
0 0
µA Zero
(0µA)
1 0 0 0
µA Span
(100µA)
0 0
Temp Zero
(1k0)
1 3 0 5
Temp Span
– – – – –
Adjust RTX Zero
– – – – –
Adjust RTX Span
Secure Parameters
Calibration Page
– – – – –
SENSOR CAL.
0 0 0 0 0
.
°
Cal
User Code
C
– – – – –
.
Expose to Air
– – – – –
.
Calibrating Air
– – – – –
Sensor O/P
Set Up Outputs Page
– – – – –
SET UP OUTPUTS
– – – – –
A1 Action
YES
1 5 0
.
A1 Setpoint
.
– – – – –
A2 Action
.
A2 Setpoint
.
– – – – –
RTX Type
(1k5)
Test Retrans (%)
0 0 0 0 0
Alter Sec. Code
0 0 0 0 0
Alter Cal. Code
Fig. 6.1 Overall Programming Chart
6 START UP AND OPERATION...
Access to Secure Parameters
0 0 0 0 0
SECURITY CODE
Set Up Parameters Page
– – – – –
SET UP PARAMETER
– – – – –
EA
Disp Units ug/kg
.
2 0 . 0
EB
5 0
.
Adjust Dec. Pt
– – – – –
Display Span
4-20
0 0
.
Pressure
Salinity
– – – – –
Temp. Units ( C)
Note. The values shown on the pages in
this illustration are default values on despatch.
Select Language
Page
– – – – –
English
mg/kg
ug/l
mg/l
ppb
ppm
7 6 0
mmHg
0
ppt
°
15

Advertisement

Table of Contents
loading

Table of Contents