Download Print this page

Bolton Tools CEB Operation Manual page 8

Horizontal or gap-bed lathes

Advertisement

2 . G e n e r a l I n f o r m a t i o n
2.1 Notes:
2.1.1、Unpacking and inventory the accessories as packing list. Read and understand this manual and then hoist, install
the machine and test run accordingly.
2.1.2、Fix the 2 handles places in the accessories box to the carriage and apron in time, as well as the chip pan.(FIG
2-1) 。
2.1.3 The manual is edited in accordance with latest product information, which may alter for
improvement purpose without any notice.
FIG.2-1. Installment of handle and chip pan
2 - 1

Advertisement

loading