Download Print this page

Bolton Tools CEB Operation Manual page 16

Horizontal or gap-bed lathes

Advertisement

4 . T r a n s m i s s i o n s y s t e m s
4.2.2 According to the kind of thread changing transmission unit can be realised by operating handle 6 (see manual part 7
fig. 7-1). Besides it can be used for changing feed rate.
28
U
Metric threads
p
27
30
Inch threads
41
4.2.3 Feed box basic speed changing unit (U
The shaft Ⅰ,Ⅱ, and Ⅲ in gear box are consists of a basic speed changing unit, which is realised by operating handle 7
(see manual part 7 fig. 7-1).
: For metric and module threads total 7 units.They are
U
b
28
18
2
(handle position 1)
×
36
21
3
28
33
11
(handle position 7)
×
36
18
12
21
21
7
(handle position 11)
×
18
21
6
For inch and pitch threads total 10 units.They are
21
36
3
(handle position 15)
×
18
28
2
21
32
6
(handle position 12)
×
20
28
5
28
32
=1 (handle position 8)
×
32
28
28
18
3
(handle position 2)
×
32
21
4
When calculating feed rate, it should be added below unit. They are total 15 units.
28
21
7
(handle position 3)
×
32
21
9
4.2.4 They are total 4 speed double increasing unit (U
fig. 7-1)
14
15
1
(handle positionⅠor A)
×
42
40
8
14
33
1
(handle postion Ⅲ or C) connecting of internal and external tooth
×
42
22
2
4.2.5 leadscrew thread pitch:
Metric:T=12mm
Inch:T= 12.7mm (1/2 In)
4.3 Thread turning
4.3.1 Metric threads
27
×
module threads
30
27
×
30
)
b
28
18
×
32
21
28
32
×
32
28
21
32
×
18
28
28
36
×
32
28
28
32
×
36
28
14
42
28
41
×
27
29
30
41
pitch threads
×
41
29
3
(handle position 2)
4
=1(handle position 8)
4
(handle position 14)
3
9
(handle position 10)
8
8
(handle position 6)
9
), which can be realised by operating handle 8(see manual part 7
d
24
1
(handle positionⅡor B)
×
32
4
28
20
5
(handle position 4)
×
32
21
6
28
36
9
(handle position 10)
×
32
28
8
21
36
9
(handle position13)
×
21
28
7
28
36
12
(handle position 9)
×
33
28
11
21
18
6
(handle position 5)
×
21
21
7
22
=1(handle position Ⅳ or D)
22
4 -
3

Advertisement

loading