Post-Installation Checklist - Panasonic KY-R644BB Operating Instructions Manual

Table of Contents

Advertisement

Post-installation Checklist

Upon completing installation, check and mark off the following items.
Checklist
Appearance ■ Ensure that the appliance is not tilted.
■ Is the top plate clean?
Electrical
■ Is the power supply a single-phase (220-240 V ~), or
work
a three-phase (380-415 V 2N~)?
■ Has the earth been installed?
■ Has the earth leakage circuit breaker been installed?
Electrical
1. Touch
testing
■ Does the main power light illuminate?
2. Touch the following keys to check function of
each IH heater:
■ Left front cooking zone
■ Left rear cooking zone
■ Right front cooking zone
■ Right rear cooking zone
Make sure to turn off each cooking zone and the main power switch after
performing electrical testing.
Hand the Operating / Installation Instructions to the customer.
to turn on the main power.
I hereby certify that installation has been completed.
Checked
Does "-" flash?
Signature of installer
49

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ky-r644clepgKy-r644cl

Table of Contents