Specifications - Panasonic VBHN240SE10 General Installation Manual

Hide thumbs Also See for VBHN240SE10:
Table of Contents

Advertisement

When additional ground holes are
necessary, they must not penetrate
the inner side of the aluminum
frame. Caution is advised to avoid
accidentally drilling, scratching, or
penetrating the back sheet surface
of the module.
If required, it is
recommended to add additional
ground
holes
to
aluminum lip area of the module.
In such case, additional ground
holes must be at least 65 mm away
from any frame corner.
For a non-integral module or panel,
the assembly is to be mounted over
a fire resistant roof covering rated
for the application.
Appropriate material should be
used for mounting hardware to
prevent
the
module
mounting structure, and hardware
itself from corrosion.
Install modules where they are not
shaded by obstacles like buildings
and trees. Especially pay attention
to
avoid
partially
shading
modules by objects during the
daytime.
Please
contact
your
Authorized
Representative
questions
regarding
profiles for modules if needed.
Notes on Installation
Clearance of "10 cm" between the
roof surface and module frame is
required to allow cooling air to
circulate around the back of the
module.
This
also
allows
condensation
or
moisture
dissipate.
Install modules so that
air can circulate between the roof
and the module.
We
recommend
methods shown in Figure 2. In
some areas, local electrical codes
may govern the installation and
use of modules.
To avoid the hazard of the electric
shock and fire, do not contact and
damage the back sheet of the
module with mounting bolts.
Operating Conditions
SANYO recommends that modules be
operated
within
the
Operating Conditions. An installation
location with conditions beyond the
Operating Conditions or with other
Special Conditions (see below) should
be avoided.
Operating Conditions of
Panasonic HIT PV modules are as
follows:
All manuals and user guides at all-guides.com
1)
The modules should be operated
only in terrestrial applications. No
space or other Special Conditions
(see below).
2)
The ambient temperature should
be within –20°C (-4°F) to 40°C
(104°F).
3)
The relative humidity should be
the
outer
within 45% to 95%.
4)
The wind pressure load of the
installation site should be less than
2,400N/m
Special Conditions
1)
The
ambient
installation place are different from
the
recommended
Conditions.
2)
Salt
damage
frame,
installation place.
3)
Hail and snow damage is excessive
at the installation place.
4)
Sand and dust damage is excessive
at the installation place.
5)
Air
pollution,
the
vapors, acid rain, and/or soot, etc.
are excessive at the installation
place.
SANYO
with

SPECIFICATIONS

mounting
Notes on Specifications
1)
Rated electrical characteristics are
within 10% of the values measured
at Standard Test Conditions (STC).
Irradiance of 1000W/m
temperature, and solar spectral
irradiance per IEC 60904-3.
2)
Under
normal
any
module
to
conditions
current
reported at
test conditions.
installation
values of Isc and Voc should
multiplied by a factor of 1.25 when
determining
conductor capacities, fuse sizes,
and size of controls connected to
the module output.
3)
The current output for the modules
shown
in
measured
Conditions.
not
be
actual practice.
following
Application class of product
Panasonic HIT PV modules are applied
to application class A. Application class
A
for
PV-modules
follows:
Class A: General access, hazardous
voltage, hazardous power applications
Module rated for use in this application
class may be used in systems operating
at greater than 50 V DC or 240 W,
where
anticipated.
safety through this part of IEC 61730-1
and
application class
meet the requirements for safety class
II.
2
(50PSF).
Fire class of product
Panasonic HIT PV modules fill the fire
class C that provides to ANSI/UL790.
temperature
and
Class C roof coverings are effective
against light fire test exposures. Under
Operating
such exposures, roof coverings of this
class afford a light degree of fire
is
severe
at
the
protection to the roof deck, do not slip
from position, and are not expected to
produce flying brands.
Mechanical Loading
chemically
active
2
o
, 25
C cell
conditions,
a
CERTIFICATION
may
experience
VBHNxxxSE
that
produce
more
series comply with the requirements of
and/or voltage than
IEC61215, IEC61730-1, IEC61730-2 and
standard component
the CE mark.
Accordingly, the
be
WIRING
General
voltage
ratings,
the
Specifications
is
at
Standard
Test
These conditions may
frequently
observed
in
are
defined
as
3
general
contact
access
Modules
qualified
IEC
61730-2
and
within
are
considered
The modules should be mounted
basically at the four (4) quarter
points by the means shown in
Figure 1-1 or 1-4. However, you
may choose the optional mounting
ranges (with limitation of fixing
span) by means shown in Figure 1-
2 or Figure 1-3 for VBHNxxxSE
series, in Figure 1-4 or 1-5 for
VBHHxxxAE series.
This method offers a maximum
load of 2400N/m2 (50PSF, in a
static state) on the module surface.
series
and
VBHHxxxAE
All
wiring
should
be
done
accordance
with
applicable
electrical codes.
All wiring should be done by a
qualified, licensed professional.
Wiring should be protected to help
ensure
personal
safety
and
prevent its damage.
All modules connected in series
should be of the same model
number and/or type.
Do not connect modules in parallel
without using a connection box.
Do not disconnect terminals while
modules generate electricity and
connect electrical load to avoid the
hazard of electrical shock.
To avoid the hazard of electric
shock and sparks, please connect
April 2012
is
for
this
to
in
to

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents