Toro 33525 Operator's Manual page 9

Spreader attachment stand-on aerator
Table of Contents

Advertisement

5
Installing the Control Cable
Parts needed for this procedure:
1
Control cable
2
Locknut (1/4 inch)
2
Washer
Procedure
1.
Ensuring that the cable ball joint is securely
attached to the cable, connect the ball joint to
the control arm and secure it with a washer and
locknut (1/4 inch) as shown in
1. Cable ball joint
2. Control lever
3. Locknut (1/4 inch)
4. Cable-mount bracket
2.
Loosen the knob and slide the control cable into
the notch of the mount bracket and tighten the
knob.
3.
Route the other end of the control cable to the
gate arm.
Figure
6.
Figure 6
5. Knob
6. Washer
7. Jam nut
1. Locknut (1/4 inch)
2. Washer
3. Gate arm
4.
Insert the cable end into the hole of the gate
arm; secure the cable end with a washer and
locknut (1/4 inch) as shown in
5.
Loosen the nuts on each side of the control cable
and slide it into the notch of the hopper bracket.
Tighten the nuts on each side of the bracket.
6.
Move the flow control lever forward and
rearward, making sure that the gate arm fully
opens and closes. If it does not close, loosen
the knob and/or nuts to adjust the cable until the
gate can be fully closed; tighten all components.
Make sure that the jam nut has been securely
tightened against the cable ball joint after all
adjustments have been made
g221603
9
Figure 7
4. Cable end
5. Hopper bracket
Figure
7.
(Figure
6).
g213569

Advertisement

Table of Contents
loading

Table of Contents