Advertisement

Quick Links

quick guide
aj 1000 - 2400
swiss made power

Advertisement

Table of Contents
loading

Summary of Contents for Studer aj 1000

  • Page 1 1000 - 2400 swiss made power...
  • Page 2 Suisse. Il bénéficie d’une designed and assembled garantie de 5 ans et est éligible à une extension 5+5. by studer in Switzerland Herzlichen Glückwunsch ! Wir freuen uns, dass Sie sich für eines High-Tech-Gerät entschieden haben, welches bei der Energie-management Ihrer Anlage entscheidende Rolle spielen wird.
  • Page 3: General Information

    Studer disclaims all responsibility and liability for damage, costs or losses resulting from an installation that does not comply with the instructions, a faulty operation or inadequate maintenance. The use of studer equipment is in any case under the responsibility of the customer.
  • Page 4: Mounting And Installation

    Mounting and installation Storage and content Fixing and dimensions 428mm 199mm 60°C -20°C min. 100mm min. 100mm Mounting place 442mm 84.4mm The batteries should only be installed by qualified personnel. 8.5 - 19kg 207mm 58mm...
  • Page 5 Protection device (battery fuse included) L’appareil doit être installé conformément aux normes et réglementations locales en vigueur. • aj 1000-12: 125A / aj 1300-24: 100A Das Gerät muss gemäß den geltenden örtlichen Normen und Vorschriften installiert werden. * on request •...
  • Page 6 Display solar* PV (s models) on – charge off – night on – AC out present 230V / 120V ac blink – floating off – AC out not present, the solar charge controller (s models) remains in operation even if the inverter is off blink : _ _ _ _ _ no load (standby) __ __ __ __ __ alarm (automatic restart) manual ON/OFF button...
  • Page 7: Activation/Deactivation Of Functions

    Power up Activation/deactivation of functions solar PV Status default Time (s) Description 5’’ acustic alarms 1 BIP 10’’ 2 BIP 15’’ alarms voltage flickering 2 BIP 20’’ read-only settings 1 BIP long = end Acoustic indicator Intermittent beeps : Failure! Output voltage will be interrupted.
  • Page 8: Technical Data

    Entretien et recyclage À l’exception du contrôle périodique des branchements (serrage, état général), le aj ne nécessite pas d’entretien particulier. Pour vous aj 1000-12 aj 1300-24 aj 2100-12 aj 2400-24 débarrasser de ce produit, veuillez utiliser les services de collecte des...
  • Page 9 Serial Number : Installed by : Date : Signature : Call our specialists +41 27 205 60 80 or visit studer-innotec.com/support Studer Innotec SA rue des Casernes 57 1950 Sion, Switzerland info@studer-innotec.com 4O92 © All rights reserved Studer Innnotec SA – V1.0...

This manual is also suitable for:

Aj 1200

Table of Contents