Connecting; Connecting Ch Installation - Daikin Rotex GW-30 H12 Installation Instructions Manual

Wall-mounted gas condensing boiler
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 53
5

CONNECTING

5.1

Connecting CH installation

1.
Rinse the CH installation carefully.
2.
Fit the supply pipe (A) and return pipe (B) to the connection set.
3.
All pipes must be assembled with no electrical current, in order to prevent shocks
from the pipes.
4.
Existing connections may not be rotated, in order to prevent leakages.
The CH installation must be fitted with:
A filling/draining tap (A) in the return pipe, immediately underneath the unit.
A draining tap at the lowest point of the installation.
An overflow valve (B) of 3 bar in the input pipe at a distance of no more than 500
mm from the unit.
Between the unit and the overflow valve there may be no valve or constriction.
An expansion vessel in the return pipe (in the B-pack or in the installation).
A check valve, if there are pipes running up, within close distance of the unit. This
prevents a thermosiphon effect from occurring during tap water operation (a non
spring-operated return valve, must be assembled vertically).
5.1.1
Thermostatic radiator taps
If all radiators are fitted with thermostatic or cable radiator taps, a minimum water
circulation must be safeguarded. See par. 7.4.
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rotex gw-30 h18Rhobg12aav1Rhobg18aav1

Table of Contents