Installation; Mesures D'installation - Daikin Rotex GW-30 H12 Installation Instructions Manual

Wall-mounted gas condensing boiler
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 53
4

INSTALLATION

4.1

Mesures d'installation

Chaudière montée directement au mur :
Unité + chaise de montage
A =
Alimentation de
chauffage
B =
Retour de chauffage
C =
Gaz
D =
Sortie de condensation
h =
517 mm
H =
590 mm
Z =
Sortie de gaz de
combustion/entrée d'air
G ¾" (ext)
G ¾" (ext)
G ½" (int)
Ø dn25 (flexible)
RHOBG12AAV1
RHOBG18AAV1
RHOBG12AAV1
RHOBG18AAV1
Ø 60/100 (concentrique)
10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rotex gw-30 h18Rhobg12aav1Rhobg18aav1

Table of Contents