Operating and Assembly Instructions – A.B.S. Flexilo TROUGH for wood pellets
Filling instructions (Provide these filling instructions to the filler)
If a second filling line is present:
a) Filling with line 1 until an optimal spreading is reached on the
first side. In this case you have the possibility to exhaust with
line 2, but this is not necessary.
b) Filling with line 2 until you have reached the maximum filling
level. Do not use line 1 for exhausting.
Please control in advance
o The filling-set bracket must be bolt together with the lifting bar.
o The filling pipes must be bolt together among each other by clamping rings so
that no rotation occurs.
o The filling coupling must be easily accessible (without using ladders etc.) and
reachable.
o The fabric neck on the filter lid must be pulled as far as possible over the filling
pipe and beading rim and it must be fixed with a hose clamp.
o All parts of the filling-system must be earthed and connected conductively.
o Fasten the filling-set on the frame as well as controlling the filling parts among
each other
o If filling is affected from the outside please check the installment situation in
the inside.
o Close all the other openings on the silo bag.
Subject to technical change
©A.B.S. Silo- und Förderanlagen GmbH
Issue 09/2016
Filling line 1
Filling line
Befüllleitung 1
Befüllleitung 1
Befüllleitung 2
Befüllleitung 2