A.B.S. Flexilo MINI Assembly-, Operating-, And Filling Instructions

For wood pellets. construction: plug-in system galvanized

Advertisement

Quick Links

Assembly-, Operating-, and Filling Instructions
Flexilo MINI for wood pellets
Construction: Plug-In System galvanized
Information on the manual:
The present assembly manual contains important information on safe and appropriate
assembly of the A.B.S. Flexilo MINI for the storage of wood pellets. The assembly manual is
intended for skilled mechanics, which have, based on expert training, the respective
knowledge and experience. As we are interested in continuously improving our technical
documentation, we would be pleased to get suggestions for improvement.
The manual has to stay with the heating system or the silo. Please make
sure that the manual is at any time on-hand if required.
A.B.S. Silo- und
Förderanlagen GmbH
Industriepark 100
74706 Osterburken - Germany
Tel.
+49 62 91/ 64 22-0
Fax
+49 62 91/ 64 22-50
info@abs-silos.de
www.abs-silos.de

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Flexilo MINI and is the answer not in the manual?

Questions and answers

Summary of Contents for A.B.S. Flexilo MINI

  • Page 1 Information on the manual: The present assembly manual contains important information on safe and appropriate assembly of the A.B.S. Flexilo MINI for the storage of wood pellets. The assembly manual is intended for skilled mechanics, which have, based on expert training, the respective knowledge and experience.
  • Page 2: Table Of Contents

    Operating and Assembly Instructions – A.B.S. Flexilo MINI for wood pellets Table of contents Table of contents: Note ..........................3 Symbols used ......................3 Normative references ....................3 Pellet quality, Intended use ..................3 Approvals and Compatibility to Pellet Boilers............4 Warranty and Guarantee ..................
  • Page 3: Note

    Operating and Assembly Instructions – A.B.S. Flexilo MINI for wood pellets General Information 1 Note Please read these Instructions prior to assembling the A.B.S. Flexilo MINI for wood pellets. 1.1 Symbols used Danger! This symbol identifies a hazard that could cause serious bodily injury or even death if appropriate precautionary measures are not taken.
  • Page 4: Approvals And Compatibility To Pellet Boilers

    Operating and Assembly Instructions – A.B.S. Flexilo MINI for wood pellets General Information Quality A1 Quality A2 diameter (mm) 6 or 8 length(mm) 3,15 to 40 moisture content (% by mass) <=10 ash content (% by mass) <=0,7 <=1,2 mechanical strength (% by mass) >=97,5...
  • Page 5: Warranty And Guarantee

    Operating and Assembly Instructions – A.B.S. Flexilo MINI for wood pellets General Information 1.5 Warranty and Guarantee The "General Terms and Conditions of Business of A.B.S.” apply in all cases. These are available to the operator no later than upon conclusion of the sales agreement. Warranty and liability claims associated with personal injury or property damage are excluded if they can be attributed to any one or several of the following causes.
  • Page 6: Safety Information

    Operating and Assembly Instructions – A.B.S. Flexilo MINI for wood pellets Safety Information 2 Safety Information Please observe the following safety information! 2.1 General safety information Danger to life in the event of a dust explosion caused by electrostatic discharge •...
  • Page 7: Fire Prevention

    Operating and Assembly Instructions – A.B.S. Flexilo MINI for wood pellets Safety Information 2.2 Fire prevention All fire prevention regulations must be satisfied prior to start-up. (subject to country-specific modifications). 2.3 Earthing Attention! Let the earthing of your pellet storage area be executed by a specialized company.
  • Page 8: Storage Aeration

    Operating and Assembly Instructions – A.B.S. Flexilo MINI for wood pellets Safety Information • The bolting of the steel frame should be checked as well. • Please check the fastenings of the Filling and removal systems. • Make sure that all other openings on the silo are closed.
  • Page 9: Room Layout

    Operating and Assembly Instructions – A.B.S. Flexilo MINI for wood pellets Room Layout 3 Room Layout Please observe the following planning steps; only in this way can problem-free operation be assured. Failure to comply can result in damage to the equipment and system malfunctions or put individuals and equipment at risk.
  • Page 10: Condition Of The Room

    Operating and Assembly Instructions – A.B.S. Flexilo MINI for wood pellets Room Layout 3.2 Condition of the room A stable supporting surface as the installation site is a prerequisite for setting up the silo. The floor must be horizontal; if this is not the case, any unevenness must be corrected through use of suitable underlay material (e.g.: steel plates).
  • Page 11: Room Deaeration

    Operating and Assembly Instructions – A.B.S. Flexilo MINI for wood pellets Room Layout 3.4 Room deaeration The conveying air used to blow the pellets into the pellet silo must be allowed to escape during filling by opening a window or door.
  • Page 12: Scope Of Delivery

    Operating and Assembly Instructions – A.B.S. Flexilo MINI for wood pellets Scope of delivery Scope of delivery The Flexilo MINI for wood pellets consists of a steel frame, which is shipped bundled on a pallet, and a silo bag, which is packed in a carton together with accessories and hardware required for assembly.
  • Page 13 Operating and Assembly Instructions – A.B.S. Flexilo MINI for wood pellets Scope of delivery 4 each head connectors 4 each middle connectors 1 x Nameplate (included in delivery note-bag) Table listing items included in the shipment Subject to technical change...
  • Page 14: Optional Accessories

    Operating and Assembly Instructions – A.B.S. Flexilo MINI for wood pellets Scope of delivery 4.2 Optional Accessories Depending on boiler-type resp. on the conveying system of the heating system; different extraction systems are offered for the Flexilo MINI for wood pellets.
  • Page 15: Assembly

    Operating and Assembly Instructions – A.B.S. Flexilo MINI for wood pellets Assembly 5 Assembly Do not start assembling the silo until you have become familiar with the situation at the installation site and the room layout discussed in Section 3.
  • Page 16: Assembling Feed Tube With Stay Tube

    Operating and Assembly Instructions – A.B.S. Flexilo MINI for wood pellets Assembly 5.2 Assembling feed tube with stay tube At first push the stay tubes through the provided loops on the silo. After that you connect the stay tubes with the feed tubes side for side.
  • Page 17: Fixation

    Operating and Assembly Instructions – A.B.S. Flexilo MINI for wood pellets Assembly 5.3 Fixation Tighten the screw connections strongly. Fix the frame on the ground. Ground all steel parts, as described in chapter "Grounding". 5.4 Assembling the extraction devices Finally, you must mount the extraction system supplied with the silo (suction box, screw box).
  • Page 18: Final Inspection

    Operating and Assembly Instructions – A.B.S. Flexilo MINI for wood pellets Final inspection 6 Final Inspection Position of the extraction device Check that the discharge neck is centered in the silo. Adjust the silo or extraction unit so that the silo is centered exactly over the point of discharge.
  • Page 19: Extract From Accident Prevention Regulations

    Operating and Assembly Instructions – A.B.S. Flexilo MINI for wood pellets Extract from accident prevention regulations LagerstättenVSG 2.2 vom 1. Januar 2000 7 Extract from accident prevention regulations Stand 14. Dezember 2007 Agricultural Trade Association for Central and Eastern Germany OT Hönow Hoppegartener Str.

Table of Contents