Attaching The Payload To The Stage - Aerotech AMG Series Hardware Manual

Hide thumbs Also See for AMG Series:
Table of Contents

Advertisement

AMG Hardware Manual

2.4. Attaching the Payload to the Stage

Inspect the mounting surface for dirt or unwanted residue and clean if necessary. Clean the mounting
surface with a lint-free cloth and acetone or isopropyl alcohol and allow the cleaning solvent to completely
dry.
Aerotech recommends that customers use a representative payload during start-up to prevent accidental
damage to the stage and the payload. Proceed with the electrical installation and test the motion control
system in accordance with the system documentation. Document all results for future reference. For
information on electrical installation refer to
N O T E : If your AMG was purchased with Aerotech controls, it might have been tuned with a
representative payload based on the information provided at the time of order. If the AMG is started up
without a payload, the servo gains provided by Aerotech with the shipment may not be appropriate and
servo instability can occur. Refer to the controller help file for tuning assistance.
The payload must be flat, rigid, and comparable to the stage in quality to maintain optimum performance.
The standard AMG series is capable off accommodating cells up to 600 mm in diameter. Custom solutions
can be designed for non-standard loads.
www.aerotech.com
Mechanical Specifications and Installation
Chapter 3
and the documentation delivered with the stage.
Chapter 2
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Amg200Amg300Amg400Amg500Amg600

Table of Contents