Correcting After Abnormal Completion Of The Test Run; Operating The Unit - Daikin VRV IV Q+ Series Installer And User Reference Manual

Hide thumbs Also See for VRV IV Q+ Series:
Table of Contents

Advertisement

21
|
Commissioning

21.6 Correcting after abnormal completion of the test run

21.7 Operating the unit

Installer and user reference guide
142
Completion
Abnormal completion
The test operation is only completed if there is no malfunction code displayed on
the user interface or outdoor unit 7‑segment display. In case of a displayed
malfunction code, perform correcting actions as explained in the malfunction code
table. Carry out the test operation again and confirm that the abnormality is
properly corrected.
INFORMATION
Refer to the installation manual of the indoor unit for detailed malfunction codes
related to indoor units.
Once the unit is installed and test operation of outdoor unit and indoor units is
finished, the operation of the system can start.
For operating the indoor unit, the user interface of the indoor unit should be
switched ON. Refer to the indoor unit operation manual for more details.
Description
Indication of malfunction code on the 7‑segment display.
Refer to
"21.6 Correcting after abnormal completion of
4
the test
run" [
 142] to take actions for correcting the
abnormality. When the test operation is fully completed,
normal operation will be possible after 5 minutes.
RXYQQ8~20U7Y1B
VRV IV Q+ series heat pump
4P546229-1A – 2020.10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents