Color Coding READ THIS BEFORE YOU BEGIN Purchased greenhouse and all accessories & systems require a specific installation sequence. All components have been separated into different categories based on common grouping and/or the chronology of installation. Each category has been color coded. All parts within any given color category will be labeled accordingly, and each color category will have its own respective instruction manual.
Page 3
Color Coding GREEN Main Frame Film Cladding Installation Chronology MUST READ: All components that are color coded GREEN represent the main frame film cladding of the greenhouse. ***Color coded components that MUST be installed before installing GREEN: ORANGE BLUE If above color coded components have not yet been installed, put this manual down and consult those manuals to install those components before returning.
Important Information READ THIS DOCUMENT BEFORE YOU BEGIN TO INSTALL THE MAIN FRAME CLADDING. Thank you for purchasing a Series 500 greenhouse kit with a black-out system, ventilation & evaporative cooling. When properly assembled and maintained, this product will provide years of reliable service. These instructions include helpful hints and important information needed to safely assemble and properly UNPACK AND IDENTIFY PARTS...
Page 5
Attach 102197 to Baseboard Film cover for the greenhouse will be secured to runs of 102197 spring channel running lengthwise along the base. For ease of installation and for light sealing purposes, it is recommended that a baseboard be installed (see RED manual). The diagrams below show where to install the 102197.
Page 6
Film Cover Installation INSTALL IR/AC FILM COVER IMPORTANT: Before installing the cover, verify that the following have been installed: end wall frame & end wall cladding. Only after these items have been installed should you continue with the cover installation. Gather the parts: •...
Page 7
Film Cover Installation 3. Along the edge, clamp self-locking, duck-billed pliers to the cover material and Clamp self-locking, tie ropes or straps to the pliers. duck-billed pliers along the cover edge, tie NOTE: The ropes or straps must reach over the top of the building to the ropes or straps to the other side.
Page 8
Film Cover Installation 6. Once main cover is in place and centered, begin at the peak of one end and install the 102198 wire spring into the 104546 channel installed during BLUE steps. ATTENTION: Ensure that enough cover material is present to lock into the end rafter 104546 channel. Typically, the cover material is cut longer/wider than required to cover the building.
Page 9
Inflation Fan Kit Installation The 115842 Air Inflation System assembly is quick and easy. Follow instructions included with 115842 kit components. After installing the air inflation system (or systems), continue by installing the second layer of film as described on the following pages.
Page 10
Inflation Fan Kit Installation Once the air inflation kit or kits are installed, install the remaining layer of film for the greenhouse (#1115842). Simply repeat the steps for the cover installation for your greenhouse. Follow these guidelines to install the remaining film: •...