Download Print this page
Best Barns Belmont II Assembly Book
Hide thumbs Also See for Belmont II:

Advertisement

Quick Links

Best Barns USA
Assembly Book
Revised July 9, 2019
;)#*3#(0%<#D2
the Belmont II
B@E%F%@AE
Manufactured by Reynolds Building Systems, Inc.
205 Arlington Drive
Greenville, PA 16125
!"#$%&'()'*%#$%+,-./#0"1234%5(32/%1"2%+,-./#0"1%*'6$7%1"#$%&'()'*
&'.%(,1%82%+,-#237%#(%6",*2%,/%#(%-'/17%6#1",)1%+,($2(1%9/,&%:2.(,*3$
;)#*3#(0%<.$12&$7%=(+4
>%%?,-./#0"1%@ABC

Advertisement

loading
Need help?

Need help?

Do you have a question about the Belmont II and is the answer not in the manual?

Questions and answers

Summary of Contents for Best Barns Belmont II

  • Page 1 Best Barns USA Assembly Book Revised July 9, 2019 ;)#*3#(0%<#D2 the Belmont II B@E%F%@AE Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 !"#$%&'()'*%#$%+,-./#0"1234%5(32/%1"2%+,-./#0"1%*'6$7%1"#$%&'()'* &'.%(,1%82%+,-#237%#(%6",*2%,/%#(%-'/17%6#1",)1%+,($2(1%9/,&%:2.(,*3$ ;)#*3#(0%<.$12&$7%=(+4 >%%?,-./#0"1%@ABC...
  • Page 2 MPORTANT NFORMATION BOUT !"'(N%.,)%9,/%-)/+"'$#(0%,)/%N#14%L*2'$2%/2'3%1"2%9,**,6#(0%#(9,/&'1#,(%829,/2%820#((#(0%+,($1/)+1#,(4 J*6'.$%+"2+N%6#1"%.,)/%*,+'*%QRJ%,/%8)#*3#(0%+,32%,99#+2%9,/%'(.%/2O)#/2&2(1$%,/%/2$1/#+1#,($4 I*,,/S ],,3%9*,,/#(0%#$%$,*3%,-1#,('**.4%^,)%&'.%+",,$2%1,%8)#*3%.,)/%,6(%,/%-,)/%'%+2&2(1%-'34 Always wear safety glasses when cutting or nailing! !,,*$%:2O)#/23S Q'(3%,/%?#/+)*'/%<'6 U2V2* <'921.%Z*'$$2$ ?,/3*2$$%T/#** H2'$)/#(0%!'-2 T)$1%H'$N Q'&&2/ WEGCE%U'332/X$Y L"#**#-$%<+/263/#V2/ L2(+#* I/'&#(0%<O)'/2 J33#1#,('*%H'12/#'*$%G%Not included in kit: :2O)#/23S <"#(0*2$%,/%&21'*%/,,9#(07%T/#-%M3027%:,,9#(0%['#*$%,/%<+/26$7%L'#(1 R-1#,('*S ?')*N7%:#302%\2(1 Primed Siding Detail !2/&#(,*,0.S <O)'/2%G%?,(9#/&%+,/(2/$%'/2%'1%_A%320/22$ LAP Edge L*)&8%G%?,(9#/&%6'**$%'(3%1/)$$2$%'/2%$1/'#0"1%V2/1#+'**.
  • Page 3 Details for Optional Deluxe Floor System I,)(3'1#,(%$#D2%#$%B@EGAd%F%@AEGAd4%%?"2+N%*,+'*%8)#*3#(0%+,32$%#(%.,)/%'/2'7%1"2%+,($1/)+1#,(%&'. "'V2%1,%+"'(024%%I,/%'%+,(+/212%$*'87%#($1'**%$#**%$2'*2/%'$%'%&,#$1)/2%8'//#2/%821622(%1"2%+,(+/212 '(3%1"2%6'**%-*'12$4%%I,'&%$#**%$2'*2/%+'(%82%-)/+"'$23%'1%",&2%+2(12/$%#(%/,**$%iGBh@d%,/%6#32/4 B4 <1'002/%1"2%`F`%1#&82/$%'$%$",6(%82*,64%%?)1%X@Y%16,%@F`G%CE%8,'/3$%#(1,%@E%*,(0%8*,+N$ 1,%$2+)/2%1"2%`F`$%6"2/2%1"2.%8)11%1,021"2/4 15-1/4" 16" 16" 16" @4 ?)1%X@Y%16,%@F`GCE%1,%'%*2(01"%,9%CE%GAd4%%!"2. 6#**%82%)$23%9,/%1"2%b,#$1%"2'32/$4%%U'.,)17%9/,& *2917%9,/%BWd%,(%+2(12/%b,#$1%$-'+#(04%%EeE%&'/N$ 6"2/2%9*,,/%b,#$1%6#**%82%-*'+234 i4 ?)1%XBfY%$2V2(122(%@F`GB@E%1/2'123%8,'/3$%1,%BBE%G_d4%!"2$2%6#**%82%1"2%9*,,/%b,#$1$4%Treated lumber may be thicker than 1-1/2". Take this into account when cutting the length of floor joists. Shorten joist measurements if necessary to obtain 12'-0" building width. `4 =($1'**%1"2%9*,,/%b,#$1$%+)1%'8,V2%821622(%1"2%CE%b,#$1%"2'32/$4%<2+)/2%6#1"%BW3%0'*V4%32+N%('#*$4 K4 L*'+2%9*,,/%'$$2&8*.%,V2/%1"2%`F`$4%%<O)'/2%9*,,/%'$$2&8*.4%%H2'$)/2%1"2%9*,,/%3#'0,('**.
  • Page 4 Step 1 Assemble 12' Back Wall Wall Plate B``d B4 ?)1%X@Y%16,%@F`GB@E%1,%'%*2(01"%,9 B``d4%L,$#1#,(%1"2%8,'/3$%1,021"2/%'(3 #(3#+'12%6#1"%EeE%%&'/N$%6"2/2%1"2 24" 24" 6'**%$1)3$%6#**%82%*,+'1234 23-1/4" 144" Wall Plate Pre-Cut Wall Studs Depending on your location pre-cut wall studs vary in length from 92-1/4" to 93". This doesn't affect construction. @4 =($1'**%XfY%$2V2(%-/2G+)1%6'**%$1)3$%821622(%1"2%1,-%a%8,11,&%-*'12$4 ['#*%$1)3$%1,%6'**%-*'12$%6#1"%BA3%$#(N2/$7%X@Y%16,%('#*$%,(%2'+"%2(34! i4 <O)'/2%6'**%9/'&24%H2'$)/2%1"2%6'**%3#'0,('**.%X+,/(2/%1,%+,/(2/Y4%!"2(%&2'$)/2...
  • Page 5 Step 2 Assemble 10' Side Wall Frames B4 ?)1%X@Y%16,%@F`GBAE%8,'/3$%1,%'%*2(01"%,9%BBWGBh@d4%L,$#1#,(%1"2%8,'/3$%1,021"2/%'(3%#(3#+'12 6#1"%EeE%%&'/N$%6"2/2%1"2%6'**%$1)3$%6#**%82%*,+'1234 @4 H'/N%'%E?E%'(.6"2/2%821622(%9#/$1%16,%$1)3%&'/N$4%!"#$%#$%/292/2(+23%#(%'%*'12/%$12-4 Wall Plates %BBWGBh@d Top Wall Plate Bottom Plate 24" 24" 19-3/4" Stud Spacing i4 =($1'**%XWY%$#F%-/2G+)1%6'**%$1)3$%821622(%1"2%1,-%a%8,11,&%-*'12$%6#1"%X@Y%16,%BA3%$#(N2/$%,( 2'+"%2(34 Pre-Cut Wall Studs 116-1/2" Wall Plate `4 :2-2'1%1,%'$$2&8*2%XiY%1"/22%&,/2%BBWGBh@d%*,(0%6'**%9/'&2$4%!"2%$#3#(0%6#**%82%'--*#23%'912/ 1"2%6'**$%'/2%$21%,(%1"2%9*,,/4 Step 3 Assemble Door Header B4 U,+'12%X@Y%16,%@FCGCE%8,'/3$4%?)1%1"2$2%8,'/3$%1,%'%*2(01"%,9%fKd4 @4 J$$2&8*2%1"2%3,,/%"2'32/%)$#(0%@FC%8,'/3$%'(3%X@Y%16,%fGBh`d%F%`Cd%R<;%9#**2/%#(+*)323%#( ,)/%N#14%J--*.%6,,3%0*)2%1,%8,1"%$#32$%,9%R<;%'(3%#($1'**%XBY%,(2%9#**2/%1,%,(2%2(34%?)1%1,%9#1...
  • Page 6 Step 4 Assemble Front Wall Frame B4 ?)1%X@Y%16,%@F`GB@E%8,'/3$%1,%'%*2(01"%,9%B``d%9,/%6'**%-*'12$4%L,$#1#,(%1"2%8,'/3$%1,021"2/%'(3 #(3#+'12%6#1"%EeE%H'/N$%6"2/2%1"2%6'**%$1)3$%6#**%82%*,+'1234 Install these Studs Centered 33" 33" @4 =($1'**%XWY%$#F%-/2G+)1%6'**%$1)3$%821622(%1"2%6'**%-*'12$%6"2/2%$",6(4 i4 ?)1%X@Y%-/2G+)1%$1)3$%1,%' 2x4 Blocks *2(01"%,9%fCGBh@d%'(3%#($1'** nail nail 2x8 Door Header '$%"2'32/%$)--,/1$%6"2/2 $",6(4%['#*%1,%$1)3$%6#1"%BA3 $#(N2/$4 `4 =($1'**%1"2%3,,/%"2'32/%,(%1"2 @F`%"2'32/%$)--,/1$4%['#*%1, 1"2%$1)3%6#1"%BA3%$#(N2/$4 78-1/2" Header Support K4 :2&,V2%'%@F`%$+/2623%1,%1"2 -'**214%H2'$)/2%$-'+2%821622( "2'32/%'(3%1,-%-*'124%?)1%X`Y 9,)/%-#2+2$%1,%1"#$%*2(01"4 MV2(*.%$-'+2%-#2+2$%'(3%('#*...
  • Page 7 Step 5 Set Walls B4 M/2+1%8'+N%6'**%'(3%BAE%$#32%6'**%9/'&2$4% =($1'**%1"2%$#32%6'**%9/'&2$%6#1"%1"2 IMPORTANTS% E?E%&'/N$%,/#2(123%'0'#($1%1"2%8'+N%6'**%-'(2*%'(3%9/,(1%6'**%+,/(2/$4%<2+)/2%6'**$%1,021"2/%'1 1"2%+,/(2/$4%5$2%X`Y%9,)/%BA3%$#(N2/$%-2/%+,/(2/4%;/'+2%6'**$%6#1"%-/2G+)1%6'**%$1)3$%1,%",*3 6'**$%$2+)/2%'(3%-*)&84 @4 <1'/1#(0%'1%8'+N%+,/(2/%#($1'**%'%9)**%6#31"%$#3#(0%-'(2*%6#1"%1"2%EUJLE%2302%9*)$"%6#1"%1"2%$#3#(0 ,(%8'+N%6'**4%<#3#(0%$",)*3%2F12(3%ih`d%82*,6%8,11,&%-*'124%['#*%$#3#(0%1,%8'+N%6'**%'(3%'** @F`$%)$#(0%W3%0'*V4%('#*$%$-'+23%Cd%'-'/14 Tip: If you are erecting building on a wood floor insert nails between the 3/4" floor sheathing and the 2x4 floor frame. Rest the siding on the nails while nailing to frame. i4 =($1'**%X`Y%9,)/%&,/2%$#3#(0%-'(2*$4%U'$1%-'(2* 6#**%2F12(3%'--/,F#&'12*.%iGBh@d%-'$1%6'**%9/'&2 1,%/2+2#V2%9/,(1%6'**%-'(2*4...
  • Page 8 Step 6 Install 2x4 Tie Plates B4 =($1'**%'%@F`GCE%,(%'%$#32%6'**7%9*)$"%6#1"%1"2%@F`%,(%1"2%8'+N%6'**4%=($1'**%'%@F`GB@E%9*)$"%6#1" 1"2%@F`%,(%1"2%9/,(1%6'**4%?)1%*2(01"%1,%9#14%5$2%BA3%$#(N2/$%1,%$2+)/2%1"2%1#2%-*'12$%1,%9/,(1%'(3 8'+N%6'**$%'(3%'*,(0%*2(01"4 @4 :2-2'1%1,%#($1'**%@F`$%,(%1"2%,--,$#12%$#32%6'**4 i4 ?)1%X@Y%16,%B@E%*,(0%@F`$%1,%9#1%821622(%$#32%6'**%1#2%-*'12$%'(3%#($1'**%,(%9/,(1%'(3%8'+N%6'**$4 Cut 2x4-12' to Fit 2x4-8' Tie Plate Cut 2x4-12' to Fit 2x4-8' Tie Plate Step 7 Install Metal 2x4 Joist Hangers 2x4 Gauge Block =($1'**%XBCY%2#0"122(%@F`%b,#$1%"'(02/$%'*#0(23%6#1" 1"2%6'**%$1)3$%,(%8,1"%$#32%6'**$4%5$2%'%$",/1%@F` 8*,+N%'$%'%0')02%1,%2($)/2%1"2%@F`$7%#($1'**23%#( (2F1%$12-7%6#**%82%9*)$"%6#1"%1"2%1,-%,9%1"2%@F`%1#2 -*'12%6"2(%#($1'**234%<2+)/2%1"2%"'(02/%6#1"%BGBh@d...
  • Page 9 Step 8 Install Loft Floor Important: Before securing the 2x4 floor joists make sure the side walls are plumb. The building width should be 12'-0" measuring from the outside of the 2x4 tie plates. ?)1%X_Y%(#(2%@F`GB@E%8,'/3$%1,%'%*2(01"%,9%Bifd%'(3%#($1'**%#( 1"2%&21'*%"'(02/$4%5$2%BGBh@d%"'(02/%('#*$4 Step 9A Install Loft Floor Sheathing Before installing floor sheathing consider where to locate the 2' x 4' access opening.
  • Page 10 Step 9B Install Loft Floor Sheathing continued B4 U,+'12%X`Y%9,)/%iGBh@d%F%@`d%R<;%9#**2/$4%=($1'**%'1%9/,(1%'(3%8'+N%+,/(2/$%,(%1,-%,9%@F`%1#2 -*'12$4%5$2%X`Y%9,)/%W3%+,&&,(%('#*$%2'+"4%=($)/2%1"2%$-'+2%821622(%9#**2/$%#$%_Wd4 @4 =($1'**%*,91%9*,,/#(0%821622(%R<;%9#**2/$4%M302%,9%$"2'1"#(0%$",)*3%82%9*)$"%6#1"%9/,(1%'(3%8'+N 6'**%1#2%-*'12$4%:292/%1,%1"2%$)002$123%*'.,)1%,(%-/2V#,)$%-'024%=($1'**%9*,,/#(0%)$#(0%W3%+,&&,( ('#*$%$-'+23%B@d%'-'/14 Back 96" Between OSB Fillers Side Wall Wall IMPORTANT: Do not place heavy weight on loft 3-1/2" x 24" OSB Filler at this point. Step 10 Install Corner Trim IMPORTANT: Lower Trim Must Be Installed Before Installing Roof Gables! B4 U,+'12%XiY%1"/22%@d%F%`CGih`d%9#**2/%$1/#-$4%['#*%1"2$2%,(%1,-%,9%1"2%$#3#(0%,(%1"2%8'+N%6'**4...
  • Page 11 Step 11A Assemble Gables B4 Z'1"2/%-/2G8)#*1%0'8*2%2(3%9/'&2$7%XBY%,(2%*291%'(3%XBY%/#0"17%XBY%,(2%`_GBh@d%*,(0%@F`%'(3%X@Y 16,%i@GBh@d%*,(0%@F`$%6#1"%'(0*23%2(3$4 @4 L,$#1#,(%1"2$2%+,&-,(2(1$%1,021"2/%'$%$",6(%82*,64%]"2(%'*#0(23%+,//2+1*.%1"2%8,11,&%@F`$ 6#**%82%$1/'#0"1%'(3%&2'$)/2%B@EGAd%9/,&%2(3%1,%2(34%Pre-built gable ends highlighted in gray. i4 !2&-,/'/#*.%1'+N%BF`%8*,+N$%1,%*,91%9*,,/#(0%'/,)(3%1"2%9/'&2%&2&82/$4%!"2$2%8*,+N$%6#**%82 CdGB@d%*,(0%'(3%&'.%"'V2%'(0*23%2(3$4%H'N2%$)/2%X@Y%16,%,9%1"2$2%8*,+N$%'/2%-,$#1#,(23%#($#32 2'+"%-/2G8)#*1%0'8*2%2(3%9/'&2%'$%$",6(4%L,$#1#,(%1"2%/2$1%,9%1"2%8*,+N$%'--/,-/#'12*.%$-'+23 1,%",*3%@F`$%#(%-*'+24%!"2$2%6#**%#($)/2%1"'1%'**%1/)$$2$%'(3%0'8*2$%'/2%8)#*1%2F'+1*.%1"2%$'&24 TR%[R!%('#*%8*,+N$%1,%0'8*24 `4 <2+)/2%1"2%8,11,&%@F`%1,%1"2%0'8*2%$1)3%)$#(0%X@Y%16,%@GBh@d%$+/26$4 K4 U,+'12%X@Y%16,%KGih`dFB`d%R<;%0)$$21$4%J11'+"%1"2$2%1,%1,-%,9%2'+"%0'8*2%$1)3%1,%$2+)/2%9/'&2 1,%i@GBh@d%@F`$4%5$2%W3%+,&&,(%('#*$4%<22%T21'#*%EJE4 5-3/4"x14" Gusset Detail 'A' Temporary 1x4 blocks Gable Stud Right Pre-built Gable Frame 32-1/2" Long 2x4s 1x4 Block MUST be Positioned Here and Another on...
  • Page 12 Step 11B Assemble Gables Continued K4 U,+'12%X@Y%16,%KAGih`d%*,(0%@F`$4=($1'**%1"2$2%2O)'**. $-'+23%9/,&%+2(12/%,9%1"2%0'8*24%<2+)/2%1"2%8,11,&%@F` 1,%1"2%0'8*2%$1)3$%)$#(0%X@Y%16,%@GBh@d%$+/26$%2'+"4 5-1/2"x27-3/4" Gusset W4 =($1'**%'%6,,3%0)$$21%'1%-2'N4 J--*.%0*)2%821622(%@F`$%'(3 0)$$21%'(3%('#*%)$#(0%XB`Y%9,)/122( W3%+,&&,(%('#*$4 f4 U,+'12%X@Y%16,%KGBh@dF@fGih`d 0)$$21$4%J11'+"%1"2$2%1,%1,-%,9%2'+" 0'8*2%$1)3%1,%$2+)/2%1,%1"2%i@GBh@d @F`$4%5$2%W3%+,&&,(%('#*$4 50-3/4" Gable Studs Step 12A Install Front Gable Siding B4 ?'/29)**.%1)/(%1"2%0'8*2%9/'&2%,V2/4%!2&-,/'/#*.%-*'+2%@F`$%)(32/%1"2%0'8*2%9/'&2%1,%N22-%1"2 9/'&2%*2V2*%6"#*2%#($1'**#(0%1"2%0'8*2%$#3#(04 @4 U,+'12%-/2G+)1%0'8*2%$#3#(04%],/N#(0%*291%1,%/#0"1%#($1'**%'%$#3#(0%-'(2*%6#1"%'%E1,(0)2E%2302 '*,(0%/#0"1%$#324%=($1'**%9*)$"%6#1"%2(3%,9%9/'&2%'(3%2F12(3#(0%ih`d%82*,6%1"2%8,11,&%@F`%-*'124 5$2%W3%0'*V4%('#*$%$-'+23%Cd%'-'/14 2x4s Under Flush Gable Frame Siding Extends 3/4"...
  • Page 13 Step 12B Install Gable Siding continued i4 =($1'**%+2(12/%$#3#(04%=9%.,)%-)/+"'$23%'%$)(8)/$1%6#(3,6%.,)%&'.%+)1%1"2%,-2(#(0%#(%1"2 $#3#(0%'1%1"#$%1#&24%=($1/)+1#,($%'/2%-'+N23%#(%1"2%6#(3,6%8,F4%=1%#$%'3V#$'8*2%1,%#($1'**%1"2 6#(3,6%'912/%1"2%0'8*2%#$%$21 `4 =($1'**%*'$1%$#3#(0%-'(2*4 Step 13 Install Gable Overhang B4 U,+'12%X@Y%16,%ffGihCd%*,(0%@F`%/'912/$%,(%0'8*24%=($1'**%@F`$%9*)$"%6#1"%1"2%1,-%,9%0'8*2 9/'&24%5$2%BA3%$#(N2/$4 @4 U,+'12%X@Y%16,%iAGBh`d%*,(0%@F`%/'912/$%'(3%#($1'**%1,%9#(#$"4%@F`$%6#**%2F12(3%82.,(3%2(3%,9 0'8*24 Do not remove the temporary 1x4 blocks until the roof trusses and back gable are assembled. 77-3/8" Long 2x4 30-3/4"...
  • Page 14 Step 14 Set Front Gable Important: Temporarily brace the gables with 2x4s to secure gables until the roof sheathing is installed! B4 =($1'**%0'8*2%,(%1"2%9/,(1%6'**4%<2+)/2%8,11,&%,9 0'8*2%1,%*,91%9*,,/%'(3%R<;%9#**2/$%)$#(0%BA3%$#(N2/$4 @4 ['#*%1"2%8,11,&%2302%,9%1"2%$#3#(0%#(1,%1"2%BF`%1/#&4 5$2%W3%0'*V4%('#*$4 Bottom edge of gable siding extends over 1x4 trim Front Wall Step 15 Assemble Rear Gable :2-2'1%<12-$%BB%1"/,)0"%Bi%1,%'$$2&8*2%'(3%$21%/2'/%0'8*24 Step 16...
  • Page 15 Step 17 Set Trusses B4 <1'/1#(0%'1%8'+N%0'8*2%$21%'%1/)$$%8.%$*#3#(0%2(3$%,V2/%@F`%9*,,/%b,#$14%!/)$$%2(3$%$",)*3%$21%9*'1 '1,-%9*,,/%b,#$14%<2+)/2%6#1"%XBAY%12(%W3%+,&&,(%('#*$%,(%8,1"%$#32$4 @4 ?,(1#()2%$1'(3#(0%1/)$$2$%1,%9/,(1%,9%8)#*3#(04 H'N2%$)/2%1/)$$2$%'(3%0'8*2$%'/2%-*)&84%=9 (2+2$$'/.%$-'(%'%@F`%'+/,$$%1,-$%'(3%1'+N%1, N22-%-*)&8%)(1#*%/,,9%$"2'1"#(0%#$%#($1'**234 Step 18 Install Sidewall Trim It's easier to install the soffit if the corner and sidewall trim are installed first. This enables the soffit to rest on the trim where it meets the building. See lower detail. B4 U,+'12%'%ihCd%F%id%F%Cd%$#3#(0%0')02%8*,+N%-'+N23 #(%1"2%"'/36'/2%8'04%L*'+2%1"#$%0')02%8*,+N%)(32/ 1"2%@F`%,V2/"'(0%'(3%8)11%'%__d%*,(0%BF`%1/#&...
  • Page 16 Step 19 Install Soffit B4 U,+'12%X`Y%9,)/%%_Gih`d%F%`Cd%$,99#1%-'(2*$4%R(%1"2%9/,(1%0'8*2%('#*%9#/$1%$,99#1%6#1"%1"2%EUJLE 2302%-,$#1#,(23%_Gih`d%9/,&%1"2%8,11,&%2(3%,9%1"2%@F`%1,%'**,6%9,/%1"2%6#31"%,9%1"2%$,99#1%-'(2*$ ,(%1"2%$#32%6'**$4%5$2%W3%0'*V4%('#*$4 @4 ?)1%1,%9#1%(2F1%$,99#1%1,%+,V2/%@F`%'1 1"2%-2'N4%=($1'**%X@Y%16,%$,99#1%-'(2*$ ,(%,1"2/%$#324 i4 U,+'12%XWY%$#F%_Gih`d%F%`Cd%$,99#1 -'(2*$4%H2'$)/2%9/,&%+2(12/%,9%9#/$1 1/)$$%1,%2302%,9%$,99#1%,(%0'8*24%?)1 '%$,99#1%-'(2*%1,%1"#$%*2(01"4%H'N2 $)/2%EUJLE%2302%#$%1"2%$#32%+)1%,994 `4 ['#*%1"2%$,99#1%-'(2*%1,%1"2%2(3%,9 1"2%@F`$4%<22%Detail 'C'%82*,64 K4 =($1'**%&,/2%$,99#1%-'(2*$%'*,(0%1"2 $#32%,9%1"2%8)#*3#(0%+)11#(0%1"2%*'$1 $,99#1%-'(2*%9*)$"%6#1"%1"2%@F`%,( 1"2%/2'/%0'8*24 W4 :2-2'1%$12-$%iGK%1,%#($1'**%$,99#1 -'(2*$%,(%1"2%9/,(1%0'8*2%'(3%1"2 ,--,$#12%$#32%6'**4 Tongue Edge at Center of Truss Cut Edge Detail 'C' Soffit 1x4 - 72"...
  • Page 17 Step 20 Install 1x6 Fascia on Side Walls B4 <1'/1#(0%'1%1"2%8'+N%0'8*27%#($1'**%'%fKd%*,(0%BFW%1/#&%8,'/3%9*)$"%6#1"%1"2%9'+2%,9%1"2%@F`4 =($1'**%1"2%BFW%8,'/3%$,%1"2%1,-%,9%1"2%8,'/3%#$%'*#0(23%6#1"%1"2%1,-%,9%1"2%1/)$$2$4%!"2%/,,9 $"2'1"#(07%installed later7%$",)*3%/2$1%,(%1"2%9'$+#'4%5$2%'%$1/'#0"1%2302%'$%$",6(%82*,64%5$2 W3%0'*V4%('#*$4 @4 =($1'**%X@Y%16,%BFWGWE%1/#&%8,'/3$%(2F14%?)1 '%`Cd%*,(0%BFW%1/#&%8,'/3%9*)$"%6#1"%1"2%9/,(1 $,99#1%,V2/"'(0%1,%9#(#$"4 i4 :2-2'1%,(%,--,$#12%$#32%6'**4 Straight Edge Soffit Step 21A Install Roof Sheathing B4 U,+'12%X@Y%`CdF_Wd%$"221$%,9%R<;4%?)1%9/,&%1"2$2%X@Y%16, `CdFK_GBh`d%$"221$4%I/,&%3/,-$%+)1%X@Y%16,%`CdFiKGBh`d $"221$4 @4 U,+'12%X@Y%`CdF_Wd%$"221$%,9%R<;4%?)1%1"2$2%#(%"'*9%1, &'N2%X`Y%9,)/%`CdF`Cd%$"221$4 Plyclip i4 I,**,6#(0%*'.,)1%82*,6%#($1'**%/,,9%$"2'1"#(0%'++,/3#(0%1, #($1/)+1#,($%,(%(2F1%-'024 Front Gable 51"...
  • Page 18 Step 21B Install Roof Sheathing continued 48"x35-1/4" B4 H'N2%$)/2%1"2%1/)$$2$%'(3%0'8*2$%'/2%-*)&84 @4 :292/%1,%1"2%/,,9%$"2'1"#(0%*'.,)14%=($1'** '%`CdFK_GBh`d%$"221%'1%*,62/%9/,(1%+,/(2/4 <"2'1"#(0%$",)*3%82%9*)$"%6#1"%$,99#1%'(3 /2$1%,(%BFW%9'$+#'4%<2+)/2%$"2'1"#(0%6#1" 48"x59-1/4" W3%+,&&,(%('#*$4%<-'+2%('#*$%B@d%'-'/14 ?,(1#()2%#($1'**#(0%1,%8'+N%0'8*24 i4 !"2%1,-%/,6%,9%$"2'1"#(0%6#**%'**,6%'%0'- '1%1"2%1,-%9,/%V2(1#*'1#,(%#9%/#302%V2(1%#$ '--*#234%=($2/1%X@Y%16,%-*.G+*#-$%#(1,%1"2 /,,9%$"2'1"#(0%821622(%2'+"%1/)$$%'1%1"2 1,-%/,67%$22%3/'6#(0%,(%-/2V#,)$%-'024 <-'+2 Step 22 Install 2x4s in Front overhang B4 <1'/1#(0%'1%1"2%-2'N%#($1'**%'%ffGihCd%*,(0%@F`%821622(%1"2%/,,9%$"2'1"#(0%'(3%1"2%$,99#1 -'(2*$4%<21%1"#$%8,'/3%9*)$"%6#1"%2302%,9%$,99#1%-'(2*$%'(3%/,,9%$"2'1"#(04%5$2%W3%0'*V4%('#*$ ,(%$,99#1%'(3%W3%+,&&,(%1"/,)0"%1"2%/,,9%$"2'1"#(04 Nail with 6d Common Nail with 6d Galv. @4 =($1'**%'%iAGBh@d%*,(0%@F`%821622( 1"2%/,,9%$"2'1"#(0%'(3%1"2%$,99#1%-'(2* i4 :2-2'1%,(%,--,$#12%$#324...
  • Page 19 Step 23 Install Door Flashing 3-1/2"x5" Flashing B4 U,+'12%X@Y%16,%iGBh@d%F%Kd%&21'*%9*'$"#(0 '(3%82(3%'*,(0%6#31"%1,%_A%320/22$4%=($1'** '1%2'+"%+,/(2/%,9%1"2%3,,/%,-2(#(04%!"2$2 6#**%82%+,V2/23%#(%1"2%(2F1%$12-$4 @4 =($1'**%1"2%0'*V4%3,,/%$#**%,V2/%9*'$"#(0%#( 1"2%+2(12/%,9%1"2%3,,/%,-2(#(04%5$2%BGBh`d -'(%"2'3%$+/26$%'*,(0%1"2%9/,(1%23024 Galv. Sill Step 24 Install Front Gable Trim and Door Trim B4 R(%9/,(1%0'8*2%#($1'**%X@Y%16,%BFW%1/#&%8,'/3$%,V2/%1"2%@F`%8,'/3$7%9*)$"%6#1"%1"2%1,-%,9 1"2%R<;%/,,9%$"2'1"#(04%5$2%W3%0'*V4%('#*$4 @4 =($1'**%0'8*2%1/#&%,(%1"2%/2'/%0'8*24 1x6 Gable Trim i4 =($1'**%'%iGfhCd%F%f@d -/#&23%b'&8%&'12/#'*%,( 1"2%1,-%,9%1"2%3,,/%,-2(#(07 9*)$"%6#1"%1"2%9/,(1%6'** $#3#(04%5$2%W3%0'*V4%('#*$4 `4 U,+'12%X@Y%16,%iGfhCd%F%f_GKhCd%-/#&23 b'&8%&'12/#'*%'(3%#($1'**%,(%1"2%$#32$%,9...
  • Page 20 Step 25 Install Pocket Doors Track B4 =($1'**%'%f@d%*,(0%!/'+N%<)--,/1%J$$2&8*.%C@Gih`d%9/,&%1"2%9*,,/4%ImportantS%&2'$)/2%9/,& 1"2%8,11,&%,9%1"2%@Fi%,(%1"2%$)--,/1%'$$2&8*.%1,%1"2%9*,,/4%=($)/2%1"2%(,1+"23%2(3%,9%1/'+N%#$ +2(12/%,9%3,,/%,-2(#(04%5$2%@GBh@d%$+/26$4 2x3 Track Support Assembly 2x8 Door Header View From Inside 82-3/4" to Floor @4 =($1'**%1"2%,1"2/%1/'+N%$)--,/1%'$$2&8*.4 Galv. Sill View From Inside K4 =($1'**%1"2%1/2'123%3,,/%$#**%82"#(3%1"2%3,,/ ,-2(#(04%!"2/2%(223$%1,%82%'%$-'+2%821622(%1"2 Screw Used 1/2'123%$#**%'(3%1"2%#($#32%6'**4%!,%-,$#1#,(%1"2 as Spacer $#**7%#($2/1%'%@GBh@d%$+/26%821622(%1"2%1/2'123 $#**%'(3%1"2%#($#32%6'**%'$%'%$-'+2/4%<+/26%1"2 $#**%1,%1"2%9*,,/%6#1"%XWY%$#F%@GBh@d%*,(0%$+/26$4 Treated Sill :2&,V2%1"2%$+/26%)$23%'$%'%$-'+2/4...
  • Page 21: Install Doors

    Step 26A Install Doors B4 <2*2+1%1"2%3,,/%6#1"%1"2%$#3#(0%'(3%1/#&%8,'/3%2F12(3#(0%-'$1%1"2%@F`%9/'&27%see detail below4 <1'(3#(0%,(%1"2%#($#32%,9%8)#*3#(0%$*#32%1"2%/,**2/$%,(%1"2%*291%$#32%1/'+N%'$%$",6(%82*,64 =9%#1%#$%(2+2$$'/.%1,%'3b)$1%1"2%3,,/%"2#0"1%,(2%,/%8,1"%3,,/%+'//#2/$%+'(%82%'3b)$1234%U,,$2( $+/26$%1"'1%$2+)/2%+'//#2/X$Y%1,%1"2%3,,/4%J3b)$1%3,,/%$,%1"2%'*)&#()&%'(0*27%,(%1"2%8,11,& ,9%1"2%3,,/7%3,2$%(,1%/)8%,(%1"2%1/2'123%1"/2$",*34%!#0"12(%1"2%$+/26$4 !#-S%=($2/1#(0%'%$+/267%shown below7%6#**%-/2V2(1%1"2%3,,/$%9/,&%9'**#(0%1"/,)0"%1"2%,-2(#(0 821622(%1"2%1/'+N7%#9%1"2%3,,/%#$%,-2(23%1,,%9'/4 T,,/%!/'+N IMPORTANT: M(3%\#26 TR%[R!%#($1'**%1/'+N%/,**2/$%#(%1"2%$-'+2%821622(%1"2%!/'+N%U20$4 <-'+2 =($1'**%1"2%1/'+N%/,**2/$%,(%1"2%#($#32%1/'+N%*204 ;21622( U20$ <22%321'#*%82*,64 !/'+N%U20 Install track rollers on this track leg. Screw Stop Adjustment Screws \#26%I/,&%=($#32 Trim & Siding Extends Past Siding...
  • Page 22 Step 26B Install Doors continued @4 Q'(0%1"2%,1"2/%3,,/4%I/,&%1"2%#($#32%,9%8)#*3#(0%+*,$2%8,1"%3,,/$4%R(%1"2%/#0"1%3,,/7%#($1'** '%$*#3#(0%3,,/%*'1+"%'1%1"2%8,11,&%,9%@F`%9/'&24%^,)%6#**%(223%1,%3/#**%'%",*2%#(%1"2%9*,,/%9,/ 1"2%/,)(3%$"'91%1,%3/,-%#(1,4 i4 =($1'**%'%&21'*%-*'12%1,%1"2%*,62/%8'+N%,9%,1"2/%3,,/4%!"2%'(0*23%2(3%6#**%N22-%8,1"%3,,/$ '*#0(23%6"2(%+*,$234 `4 I/,&%1"2%,)1$#32%#($1'**%1"2%3,,/%"'(3*2$%'(3%*,+N#(0%3,,/%"'$-%,(%1"2%,)1$#32%,9%1"2%3,,/$4 Angled Metal Plate Fold Hasp to Cover Screws Drill Hole Install Roofing — Not Supplied in Kit B4 =($1'**%&21'*%/,,9%E3/#-E%230#(0%'*,(0%1"2%-2/#&212/ ,9%1"2%/,,94 Metal Roof Edge Roof Sheathing @4 =($1'**%$"#(0*2$%'++,/3#(0%1,%1"2%#($1/)+1#,($ Optional Roof Covering ,(%1"2%6/'--2/4%=9%.,)%(223%&,/2%321'#*23 83*4...
  • Page 23 H'12/#'*%U#$1%9,/%],,3%L,+N21%T,,/$ Qty. Material Shipped in 4' Extension Kit iWd%F%f_d%],,3%T,,/$%6h%L/#&23%<#3#(0 !/)$$%:'912/$ @F` ffGihCd ;,'/3$%6h%J*)&4%!/'+N%J11'+"23 !/#&%;,'/3$ !/2'123%],,3%!"/2$",*3 !/#&%;,'/3$ Z'*V'(#D23%T,,/%<#** :#302%;*,+N @F` BCGBh@d T,,/%!/#& CBGih`d L/2G8)#*1%!/)$$%J$$2&8*#2$%G%*291"'(3 T,,/%!/#& L/2G8)#*1%!/)$$%J$$2&8*#2$%G%/#0"1"'(3 T,,/%g'&8 iGfhCd%F%f@d L/#&23%<,99#1%;,'/3$%%ihCd%F%%_Gih`dF%`CGih`d T,,/%g'&8 iGfhCd%F%f_%G%Bh`d R<;%<"2'1"#(0%%%%%%%%%fhBWd%F%%_Gih`dF%`Cd !/'+N%:,**2/$%6#1"%;/'+N21$ ],,3%Z)$$21$ BKGih`d%F%@fGBh@d <6#V2*%T,,/%U'1+" g,#$1%Q'(02/$ T,,/%Q'(3*2$ <*#3#(0%U'1+" 2'4%fhBWd%L*.+*#-$ I*'1%<122*%;'/%T,,/%Z)#*3 *84%BA3%<#(N2/$ id%F%Kd%Z'*V%I*'$"#(0 *84%W3%?,&&,(%['#*$...
  • Page 24 j1.4 Material Packaged on Pallet j1.4 Material Packaged on Pallet !/)$$%:'912/$ ffGihCd fhBWd `Cd%F%@`d%R<;%<"2'1"#(0 :#302%;*,+N BCGBh@d fhBWd `Cd%F%KBd%R<;%<"2'1"#(0 Z'8*2%RV2/"'(0 iAGih`d fhBWd `Cd%F%`Cd%R<;%<"2'1"#(0 Z'8*2%:'912/$ i@GihCd fhBWd `Cd%F%fKd%R<;%<"2'1"#(0 Z'8*2%L*'12$ `_GBh@d fhBWd _Gih`d%F%`Cd%R<;%<"2'1"#(0 Z'8*2%<1)3$ KAGih`d fhBWd _Gih`d%F%KBd%R<;%<"2'1"#(0 ]"#12%L#(2%!/#& fhBWd _Gih`d%F%K_GBh`d%R<;%<"2'1"#(0 ]"#12%L#(2%!/#& fhBWd iGBh@d%F%@`d%R<;%<"2'1"#(0 ]"#12%L#(2%!/#&...