Electrical Installation - NuAire XS Series Installation And Maintenance Manual

Table of Contents

Advertisement

Installation and Maintenance

5.0 Electrical Installation

Electrical work should be undertaken by a qualified electrician in
accordance with the wiring regulations.
1
Release the electrical panel from the fan plate.
3
Clamp the cable and complete the connections.
5.1 Wiring
5.1.1 Fan Operated By On / Off Switch
Double pole
Fuse
isolator
max. 3 amp
L
N
Connect link wire between L2 & L4 for extract OR
connect link wire between L2 & L3 for supply.
5.1.2 Fan Operated By Integral Sensor
SL
(Switched Live)
Double pole
Fuse
isolator
max. 3 amp
L
N
Connect link wire between L2 & L4 for extract OR
connect link wire between L2 & L3 for supply.
Connect switched live signal to L5 for integral timer module.
nuaire.co.uk
029 2085 8400
2
Remove the terminal cover.
4
Refit terminal cover before replacing the electrical panel.
5.1.3 Basic Fan Operated By Remote Sensor
L5
L4
or
L3
L2
L1
N
XS Fan unit
Connect link wire between L2 & L4 for extract OR
connect link wire between L2 & L3 for supply.
L5
L4
or
L3
Isolation - Before commencing work, make sure that the unit is
L2
L1
N
XS Fan unit with
integral sensor
XS Ceiling Fan Kits 50/60Hz
Remote Sensor
L1
L2
N
Double
Fuse
pole
max.
isolator
3 amp
IMPORTANT
electrically isolated from the mains supply.
15. 09. 17. Leaflet Number 671052
L5
L4
or
L3
L2
L1
N
XS Fan unit
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xs6clXs9clXs12clXs6clhXs9clhXs12clh

Table of Contents