Positioning plan
Rear
Plan view
Mark the bottom ISO corner
fittings, supports and stowing
device with numbers and 2.
Front of vehicle
direction of moving
Door side
The positioning plan shows the numbering of supports and 2 depending on the position of the ISO corner fit-
tings on the container. The individual supports must be fitted in the order of these numbers.
7. Operating
To avoid danger for persons and the machine, before you lift a container it is essential to ensure the following
–
The container has been released from the carrier vehicle.
–
The rack supports have been mounted in their correct operating position.
–
The lifting capacity has not been exceeded.
–
Adequately compacted ground is available.
To raise the container, first make sure that the gear rack supports are in contact with the ground using the ratchet
cranks. Then align the container by adjusting each support separately. The supports can now be extended indivi-
dually with the ratchet cranks fitted and the container raised to the required level.
094204_c_gb_hebvrr_v
⇑
haacon hebetechnik gmbh – Phone +49 (0) 9375 - 84-0 – Fax +49 (0) 9375 - 8466
8