Securing The Stage To The Mounting Surface - Aerotech ABL1500-B Hardware Manual

Table of Contents

Advertisement

ABL1500-B Hardware Manual

2.3. Securing the Stage to the Mounting Surface

The mounting surface must be flat and have adequate stiffness in order to achieve the maximum
performance from the ABL1500-B stage. When it is mounted to a non-flat surface, the stage can be distorted
as the mounting screws are tightened. This distortion will decrease overall accuracy. Adjustments to the
mounting surface must be done before the stage is secured.
W A R N I N G : Make sure that all moving parts are secure before moving the ABL1500-B.
Unsecured moving parts may shift and cause bodily injury.
D A N G E R : Strong rare-earth magnets are present in the linear motor magnet track. Loose
metal objects (tools, watches, keys, etc.) may cause personal injury and/or damage to the
equipment.
W A R N I N G :  The ABL1500-B must be mounted securely. Improper mounting can result in
injury and damage to the equipment.
N O T E : To maintain accuracy, the mounting surface must be flat to within 2.5 µm per 300 mm.
N O T E : The stage base is precision machined and verified for flatness prior to stage assembly at the
factory. If machining is required to achieve the desired flatness, it should be performed on the mounting
surface rather than the stage base. Shimming should be avoided if possible. If shimming is required, it
should be minimized to improve the rigidity of the system.
Procedure for ABL1500-B mounting:
W A R N I N G :  Do not attempt to move the carriage of the ABL1500-B until the air supply,
detailed in
Section
cause permanent damage to the stage.
1. Prepare the mounting surface and bottom of the stage base with precision flatstones to remove any
burrs or high spots.
2. Clean the mounting surface and bottom of the stage with the appropriate cleaners (acetone or isopropyl
alcohol for the stage bottom) and a lint free cloth.
3. Place the stage on the mounting surface.
4. Remove the lifting equipment and shipping clamps
5. Turn on the air supply to the air bearing.
6. Slide the air bearing carriage to one end of travel and compress the bellows. Insert M6 socket head cap
screws with flat washers into the exposed mounting locations. Do not fully tighten at this time, but bring
within 1/4 turn of screw head engagement.
www.aerotech.com
Mechanical Specifications and Installation
1.4., has been installed. Moving the stage table without air supplied can
Chapter 2
(Figure
2-1). Save the brackets for future use.
21

Advertisement

Table of Contents
loading

Table of Contents