Download Print this page

V-fit-ST HERCULEAN STB09-4 Manual page 21

Folding weight bench
Hide thumbs Also See for HERCULEAN STB09-4:

Advertisement

7
Slide the Lat Tower Weight Slide (59) onto the Upper Lat Tower Frame (57) now connect the Upper Lat
Tower Frame to the Lower Lat Tower Frame (56) using the Lat Tower Central Support (58) with 4 x M8
x 50mm Carriage Bolts (17), 4 x M8 x Flat Washers (23) and 4 x M8 Nylon Locknuts (26).
Fit the 980mm Upper Lat Cable (66) to the Lat Tower Weight Slide (59) and then pass the end of the
Cable with the RUBBER STOPPER under the fixed bracket on the Upper Lat Tower Frame. Fit the Pulley
(64) UNDER the Cable as shown, fitting into position using 1 x M10 x 45mm Hex Bolt (61), 2 x M10 Flat
Washers (25) and 1 x M10 Nylon Locknut (29).
Then EITHER, connect the Lat Pulldown Bar (60) to the end of the Upper Cable with a Carabina Clip (62)
OR, connect it to the 1030mm Lower Lat Cable (65). The Lower Lat Cable should be fitted correctly by
routing behind the remaining Pulley, which should then be fitted to the bracket on the Lat Tower Central
Support using 1 x M10 x 45mm Hex Bolt (61), 2 x M10 Flat Washers (25) and 1 x M10 Nylon Locknut
(29).
Slide on the Weight Retainer Clips (31) to the Lat Tower Weight Slide.
Assembly Accessories 7
PART No. DESCRIPTION . . . . . . . . . . . . . . QTY
17
M8 x 50mm CARRIAGE BOLTS . . . . . . . 4
23
M8 FLAT WASHERS . . . . . . . . . . . . . . . 4
25
M10 FLAT WASHERS . . . . . . . . . . . . . . 4
26
M8 NYLON LOCKNUTS . . . . . . . . . . . . . 4
29
M10 NYLON LOCKNUTS . . . . . . . . . . . . 2
31
WEIGHT PLATE RETAINER CLIP . . . . . . .
61
M10 x 45mm HEX BOLTS . . . . . . . . . . . 2
62
CARABINA CLIPS . . . . . . . . . . . . . . . . . 3
Note
FULLY TIGHTEN all Bolts, Nuts
and Fittings now, ensuring that
your product is located on a
clear flat surface before doing so.
Your product will now be ready
to use.
Assembly
2
Page 21

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Ab2965-uk