POWER OUTPUT AND DEMAND

120 and 240 Volt AC devices have two different electric power demands that must be taken into
consideration, namely the running power and the starting/peak power. Both are measured in Watts
(typically abbreviated as "W").
The steady state continuous load is the running power demand and this is often marked on the device
near its model number or serial number. Sometimes the device might only be marked with its voltage (i.e.
120V) and current draw (e.g. 6 Amp or 6A), in which case the running power demand in Watts can be
obtained by multiplying the voltage times the current, e.g. 120V × 6A = 720W.
Simple resistive 120V AC devices such as incandescent bulbs, toasters, heaters, etc. have no extra
power demand when starting, and so their starting power demands are the same as their running power
demands.
More complex 120/240 Volt AC devices containing inductive or capacitive elements such as electric
motors have a momentary extra power demand when starting, which can be up to seven times the
running power demand or more. Manufacturers of such devices rarely publish this starting power
demand and so it's often necessary to estimate it. A rule of thumb for devices fitted with an electric
motor is to apply a starting power multiplier of 1.2 for small hand-held or portable devices and a value of
3.5 for larger stationary devices. For example, a 900W angle grinder can be assumed to have a starting
power demand of at least 1.2 × 900W, which equals 1,080W. Similarly, a 1,650W air compressor can be
assumed to have a starting power demand of at least 3.5 × 1,650W, which equals 5,775W.
To prevent overloading of the generator's 120/240V AC system:
1. Add up the running power demand of all the 120/240 Volt AC devices that will be connected to the
generator at one time. This total must not be greater than the generator's specified running power
output.
2. Add up the running power demand again, but for the largest motor-driven device use the value of its
starting power demand instead of its running power demand. This total must not be greater than the
generator's specified starting power output.
3. The total running power demand of all the devices that will be connected to any one of the
generator's outlets must not exceed the generator's specified running power output.

BREAKING IN THE ENGINE

In order to break in the engine properly, run the generator with no load for the first hour. Then after 25
hours of normal operation change the oil.