Advertisement

Quick Links

VAX 4000 Model 100A
Installation Information
Order Number: EK–502AA–IN. A01
August 1993
This manual describes how to install and test the VAX 4000 Model 100A.
Digital Equipment Corporation
Maynard, Massachusetts

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VAX 4000 100A and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Digital Equipment VAX 4000 100A

  • Page 1 VAX 4000 Model 100A Installation Information Order Number: EK–502AA–IN. A01 August 1993 This manual describes how to install and test the VAX 4000 Model 100A. Digital Equipment Corporation Maynard, Massachusetts...
  • Page 2 The postpaid Reader’s Comments forms at the end of this document request your critical evaluation to assist in preparing future documentation. The following are trademarks of Digital Equipment Corporation: DEC, Digital, ThinWire, VAX, VAX DOCUMENT, VMS, and the DIGITAL logo.
  • Page 3: Table Of Contents

    Contents ........... . . Preface 1 Installation Procedure Step 1: Choosing a Suitable Location .
  • Page 5: Preface

    Preface This manual describes how to install and test the VAX 4000 Model 100A. It also refers to information on connecting the system to a network, connecting external options to the system, and booting the operating system. Audience This manual is intended for anyone who wants to install the VAX 4000 Model 100A.
  • Page 6 Conventions The following conventions are used in this manual: Convention Description Text displayed on the screen is shown in monospace type. MONOSPACE Italic type emphasizes important information and indicates the italic type complete titles of manuals. Note A note contains information that is of special importance to the user.
  • Page 7: Installation Procedure

    Installation Procedure This chapter shows you, step by step, how to install the VAX 4000 Model 100A. Step 1: Choosing a Suitable Location Follow these guidelines when choosing where to place the system unit: • Place the system unit where the room temperature is between 10°C and 40°C (50°F and 104°F) and the humidity is between 20% and 80%.
  • Page 8: Step 2: Unpacking The System And Identifying The Parts

    Step 2: Unpacking the System and Identifying the Parts 1. Unpack the system. 2. Make sure that you have all the parts listed on the packing slip. The loose-piece accessory kit is shipped with all basic systems. If you do not have all the parts listed, contact your Digital Sales representative.
  • Page 9: Step 3: Connecting The Console Terminal

    Step 3: Connecting the Console Terminal 1. Connect one end of the terminal cable to the modified modular jack (MMJ) port 3. This system will be shipped with a label covering ports 0 and 1. After port 3 is properly identified as the console port, the OPA0 arrow label may be removed.
  • Page 10: Step 4: Connecting The Thinwire Terminator

    Step 4: Connecting the ThinWire Terminator 1. Assemble the T-connector and the two terminators to form a ThinWire terminator. 2. Connect the ThinWire terminator to the system unit. Figure 1–3 ThinWire Termination MLO-010201 T-Connector Terminator ¡ 1–4 Installation Procedure...
  • Page 11: Step 5: Connecting The Scsi Terminator

    Step 5: Connecting the SCSI Terminator 1. Connect the SCSI terminator to the SCSI port. 2. Close the bail lock loops. Figure 1–4 Connecting the SCSI Terminator MLO-010202 SCSI Terminator Installation Procedure 1–5...
  • Page 12: Step 6: Connecting The Dssi Terminators

    Step 6: Connecting the DSSI Terminators Connect all three DSSI terminators. Note If you ordered the KFDDA–BA single-slot-card model, only one DSSI terminator will be included and connected, and the two right-hand DSSI cutouts will be covered with blanks. Figure 1–5 Connecting a DSSI Terminator MLO-010203 DSSI Terminator for all models Connected DSSI Terminators (all models except KFDDA–BA)
  • Page 13: Step 7: Connecting The Power Cord

    Step 7: Connecting the Power Cord 1. Ensure that the on/off switch is in the off (O) position. 2. Connect the power cord to the system unit. 3. Connect the other end of the power cord to an isolated, grounded circuit. Figure 1–6 Power Cord Connection MLO-010204 On/Off Switch...
  • Page 14: Step 8: Turning On The Console Terminal And System Unit

    Step 8: Turning on the Console Terminal and System Unit 1. Turn on the console terminal. Wait until it completes its power-up test. (See the terminal documentation for more information.) 2. Check the terminal settings. See the VAX 4000 Model 100A Operator Information manual for the list of correct settings.
  • Page 15: Step 9: Checking The Power-Up Test Results

    Step 9: Checking the Power-Up Test Results The power-up test can take several minutes to complete, depending on the number of installed options and on which default settings you use. 1. If the power-up test results on the screen are similar to the results in Example 1–1, the system has passed the power-up test.
  • Page 16 If SIMM_OD is not present or not plugged in correctly, the system responds with a display similar to the following example: Example 1–2 Unsuccessful Power-Up Test Screen KA52-A VX.X, VMB 2.14 Performing normal system tests. 72..71..70..69..68..67..66..65..64..63..62.. ? Test_Subtest_DC_88 Loop_Subtest=05 Err_Type=FF DE_NO_Memory_present.lis Vec=0000 Prev_Errs=0000 P1=E04EE04E...
  • Page 17: Step 10: Connecting The System To A Network

    Step 10: Connecting the System to a Network If you want to connect the system to a network, see the VAX 4000 Model 100A Operator Information manual. Step 11: Connecting External Options to the System If you want to connect external options to the system, see the VAX 4000 Model 100A Operator Information manual.
  • Page 19 Reader’s Comments VAX 4000 Model 100A Installation Information EK–502AA–IN. A01 Your comments and suggestions help us improve the quality of our publications. Please rate the manual in the following categories: Excellent Good Fair Poor Accuracy (product works as described) Completeness (enough information) Clarity (easy to understand) Organization (structure of subject matter) Figures (useful)
  • Page 20 IN THE UNITED STATES BUSINESS REPLY MAIL FIRST CLASS PERMIT NO. 33 MAYNARD MASS. POSTAGE WILL BE PAID BY ADDRESSEE DIGITAL EQUIPMENT CORPORATION INFORMATION DESIGN AND CONSULTING PKO3–1/D30 129 PARKER STREET MAYNARD, MA 01754–9975 Do Not Tear – Fold Here and Tape...

Table of Contents