Digital Equipment VAX 4000 Model 200 Installation Manual page 97

Table of Contents

Advertisement

Pre-startup requirements, VMS
factory-installed software, A–1
Printers
See Parallel printers or Serial
printers
Q
Q-bus cable, connecting, 50
R
RF-series Integrated Storage
Elements
See Integrated Storage Elements
(ISEs)
RJ11C/CA11A, RJ12C/CA12A, and
RJ13C/CA13A telephone
service, connecting, 24
RJ41S/CA41A and RJ45S/CA45A
telephone service, connecting,
28
S
SCP
See System control panel (SCP)
Selecting language, 66
Serial printers, connecting, 18
Setting
system controls, 10
Setting controls
CPU cover panel, 12
Integrated Storage Elements
(ISEs), 12
system control panel (SCP), 10
system power supply, 10
tape drive, 14
Setting up terminal lines, 32
Setup operations
console terminal, 7
Shipment, checking, 1
Site preparation, verifying, 1
Software, system
See VMS factory-installed
software
Standard network connection
CPU cover panel, 37
DESQA module, 46
Starting and modifying VMS factory-
installed software, A–1
Startup procedure, VMS factory-
installed software, A–2
Synchronous modems, connecting,
21
System
doors, closing, 69
doors, opening, 5
expander connections, 47
positioning, 4
selecting language, 66
turning on and selecting
language, 66
System control panel (SCP), setting
controls, 10
System controls
setting, 10
System-expander connections, 47
System power cable, connecting, 64
System power supply, setting
controls, 10
System software
See VMS factory-installed
software
T
Tape drive, setting controls, 14
Telephone lines, connecting internal
modem, 24
Telephone service
RJ11C/CA11A, RJ12C/CA12A,
and RJ13C/CA13A,
connecting, 24
RJ41S/CA41A and RJ45S/CA45A,
connecting, 28
Terminal
See Console terminal
Terminal lines, setting up, 32
Terminals and serial printers,
connecting, 18
ThinWire network connection
Index–5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ba430

Table of Contents