1. Set to COOL or HEAT operation using the
2. Press and hold Cancel button for 4 seconds
3. Select
4. Press On/Off button within 10 seconds, and
5. Press and hold Cancel button for 4 seconds
6. Select
Trial Operation and Field Settings
With Wired Remote Controller (BRC1E73)
remote controller.
or longer. Service settings menu is
displayed.
Test Operation
settings menu, and press Menu/OK button.
Basic screen returns and "Test Operation"
is displayed at the bottom.
the test operation starts.
Monitor the operation of the indoor unit for a
minimum of 10 minutes. During test
operation, the indoor unit will continue to
cool/heat regardless of the temperature
setpoint and room temperature.
In the case of above-mentioned
procedures 3 and 4 in reverse order, test
operation can start as well.
or longer in the basic screen.
Service settings menu is displayed.
Test Operation
settings menu, and press Menu/OK button.
Basic screen returns and normal operation
is conducted.
Test operation will stop automatically
after 15 ~ 30 minutes. To stop the
operation, press On/Off button.
Basic screen
1.
2.
Cool
Service Settings
in the service
3.
4.
5.
in the service
6.
Basic screen
Set to
68
Press and hold Cancel
F
button for 4 seconds or
longer during backlight lit.
menu screen
Press Menu/OK button.
Press On/Off button
(within 10 seconds).
Press and hold Cancel
button for 4 seconds or
longer during backlight lit.
Press Menu/OK button.
Trial Operation
116