48” natural gas models 48” lp/propane gas models (11 pages)
Summary of Contents for FiveStar TTN510-7BSW
Page 1
NSTALLATION 48” A HESE MODELS ARE FIELD CONVERITBLE FOR HESE MODELS ARE FIELD CONVERTIBLE FOR F YOU HAVE QUESTIONS CALL WEBSITE NSTRUCTIONS ROFESSIONAL ANGE ODELS ANGE WITH URNERS 48” N ATURAL ODELS *TN510-7BW *TN510-7W 48” LP/P ROPANE ODELS *PN510-7BW *PN510-7W 800-251-7224, 8 AM TO ANGE...
Consumer. • Note to Consumer Keep these instructions for future reference. • FiveStar recommends this product be installed by a licensed professional. • Product failure due to improper installation is not covered under the Warranty. WARNING: This appliance must be properly grounded.
Page 3
This will help eliminate possible damage to the backguard that is packed in the top of the range carton. Remove, unwrap and temporarily lay aside any parts that are not attached to the range.
REMOVE PACKAGING Before moving the range indoors: Remove outer carton and packing material from the shipping base. The range is now ready for removal from the wooden base. STEP 2 Due to the weight of these ranges, use a dolly with soft wheels to move this range.
STEP 5 ELECTRIC CONNECTION This range must be supplied with 120 volt, 60 Hz. and connected to an individual, properly grounded branch circuit protected by a 10 amp circuit breaker or time delay fuse. The power cord of this appliance is equipped with a...
STEP 7 (still need picture) CONNECTING THE RANGE TO GAS Because hard piping restricts movement of the range, the use of an A.G.A. certified flexible metal appliance connector is recommended unless local codes require a hard- piped connection. Never use an old connector when installing a new range.
STEP 8 LEVEL THE RANGE 1. Remove shipping tape from the leveling legs. 2. Carefully slide the range into position. Be careful not to damage the floor or entangle power cord and gas flexible tubing. 3. To adjust leveling legs, turn counter- clockwise to raise the range;...
STEP 10 ASSEMBLE SURFACE BURNER COMPONENTS • Remove shipping screw from each surface burner. • Remove each surface burner. • Place drip pan in position under each burner. Locate “dimples”. • Re-install surface burners. • Install burner pans. • Install burner grates. STEP 11 (still need picture) SURFACE BURNER OPERATION OPEN SURFACE BURNERS...
Page 10
STEP 14 CHECKLIST FOR OPEN BURNER INSTALLATION MAKE SURE ALL CONTROLS ARE IN THE “OFF” POSITION. Gas supply is “on” Electric power is “on” Burner drip pans in position under burners Surface burners in position Burner pans in positions Burner grates in position Oven and broiler racks installed Surface burner ignition test Griddle/Grill burner ignition test...