Component Assembly & Connection ~ Esbend; Component Assembly & Connection ~ Escondk; Component Assembly & Connection ~ Esroofcowl - Rinnai RHFE-308FTR Installation Manual

Energysaver co-axial flue system
Hide thumbs Also See for RHFE-308FTR:
Table of Contents

Advertisement

COMPONENT ASSEMBLY & CONNECTION ~ ESBEND
ONLY use PVC cement between externally located joints of PVC pipes to secure and seal
these joints against ingress of dust and water. ONLY use non-acidic silicone sealant between
CAUTION
externally located joints of PVC flue pipe and any mating aluminium components (such as the
condensate trap) to secure and seal these joints against ingress of dust and water. Silicone
containing acetic acid, (characteristically having a vinegar odour), as the curing agent or other
acids may cause corrosion of aluminium components and MUST NOT be used.
On "Direct", "Direct Extended" and "External Wall" installations ONLY 2 x ESBEND (2 x 90°)
can be used. On "Sideways", "Under Floor" and "In-Wall" installations ONLY 1 x ESBEND (1
x 90°) can be used.
1
2
Lubricate an ESBEND inner pipe 'O-Ring' and fit to the inner pipe of the nominated component. Use ONLY
1.
the supplied silicone based "O Ring" seal lubricant. DO NOT use petroleum based lubricants such as petroleum
jelly. The use of petroleum jelly, vaseline
of the 'O Ring' seals.
2. Fit an ESBEND outer pipe to the outer pipe of the same nominated component.
3. Insert one of plastic centering spacer provided with ESBEND, then
pipe 'O-Ring' and fit to previously fitted inner component.
The centering spacer is a MANDATORY component, that is required for the correct alignment of
Co-axial components when ESBEND kits are used. When fitted correctly the inner and outer pipes
IMPORTANT
of ESBEND will be self centering.
4. Fit a second ESBEND outer pipe to the previously fitted outer component.
5. Insert the remaining plastic centering spacer provided with ESBEND, before connecting further components.
For extended offset installations use the same procedure ensuring centering spacers are inserted as shown.
COMPONENT ASSEMBLY & CONNECTION ~ ESCONDK
ONLY use non acidic silicone sealant between the joints of 'outer' PVC flue pipes and any mating
aluminium components (such as the condensate trap) to secure and seal these joints against
CAUTION
ingress of dust and water. Silicone containing acetic acid (vinegar) as the curing agent or other
acids may cause corrosion of aluminium components and MUST NOT be used.
1
A condensate drain MUST be connected for all In-Wall
installations, for details concerning the connecting of the
CAUTION
condensate drain see page 27.
COMPONENT ASSEMBLY & CONNECTION ~ ESROOFCOWL
When connecting an ESROOFCOWL to other flue components use the same methods as described for connecting
ESPIPE900 and observe the clearance requirements detailed in the section "REGULATIONS, CLEARANCES &
GENERAL INFORMATION" refer to page 4.
Rinnai Australia
FLUE COMPONENT ASSEMBLY
3
Centering Spacer
®
or similar petroleum based lubricants will cause rapid deterioration
ESCONDK
4
5
Centering Spacer
ESFKIT03 / ESFKITIW
21
Centering Spacer
6
Centering Spacer
Lubricate the a second ESBEND inner
1.
All "External Wall" and "In-
!
Wall" flue installations MUST
be fitted with ESCONDK.
Observe
orientation of ESCONDK. The
arrow symbol MUST point
away from the heater towards
the termination of the flue
system.
Lubricate all inner pipe 'O-
Rings' with the silicone grease
provided.
ES Flue Installation Manual
the
correct

Advertisement

Table of Contents
loading

Table of Contents