Cutting ~ Esdfk, Espipe900 & Esroofcowl; Component Assembly & Connection ~ Espipe900 - Rinnai RHFE-308FTR Installation Manual

Energysaver co-axial flue system
Hide thumbs Also See for RHFE-308FTR:
Table of Contents

Advertisement

CUTTING ~ ESDFK, ESPIPE900 & ESROOFCOWL
STOP! When terminating a flue run and installing the wall terminal, follow the instructions under
"ASSEMBLING WALL TERMINAL ~ ESDFK & ESPIPE900" on page 20 for pipe cutting procedures.
IMPORTANT
Cutting is not required for the purposes of joining ESDFK, ESPIPE900 & ESROOFCOWL together
Cutting of the last component in the flue assembly (the component furthest away from the heater)
CAUTION
may be required to achieve the required flue system length. Cutting is also required at a wall
penetration. Cutting for both purposes is described below:
Cutting components to achieve a desired length
Minimum ESDFK1
1
length 300mm
Desired length
1.
Measure and mark off the outer pipe at the desired length (AA).
The minimum length (ZZ) of ESDFK when measured from the back plate of the casting MUST
NOT be less than 300mm when joining to other components.
CAUTION
Cut the outer pipe to the required length. Take care NOT to cut the inner pipe.
2.
3.
From the 'new' end of the outer pipe (cut in Step 2.), measure and mark off an additional 12mm on the inner
pipe (BB). Cut the inner pipe at this mark. Take care to keep the cut parallel with that of the outer pipe.
4.
Ensure all burrs and swarf are removed from all cut ends.
Cutting components at a wall penetration
Minimum ESDFK1
1
length 300mm
Allow 50mm
beyond any
wall penetration *
1.
Measure and mark off the outer pipe at a point flush with the surface of the wall penetrated (CC) PLUS an
additional 50mm (DD).
The minimum length (ZZ) of ESDFK when measured from the back plate of the casting MUST
NOT be less than 300mm when joining to other components.
CAUTION
Cut the outer pipe to the required length. Take care NOT to cut the inner pipe.
2.
3.
From the 'new' end of the outer pipe (cut in Step 2.), measure and mark off an additional 12mm on the inner
pipe (EE). Cut the inner pipe at this mark. Take care to keep the cut parallel with that of the outer pipe.
4.
Ensure all burrs and swarf are removed from all cut ends.
COMPONENT ASSEMBLY & CONNECTION ~ ESPIPE900
Lubricate O-Rings with the supplied O-ring grease, then fit the female aluminium inner pipe end over the male
inner pipe ends of an adjoining component.
Both the inner and outer pipes of all internal horizontal components MUST be secured with
rivets or screws. The joints of PVC outer pipes that are exposed to an outside environment MUST
CAUTION
be sealed with an appropriate PVC solvent.
Rinnai Australia
FLUE COMPONENT ASSEMBLY
Z Z
2
A A
Z Z
2
C C
D D
* Required wall
penetration
12mm
3
B B
!
1 2 m m
12mm
3
E E
!
1 2 m m
19
4
B B
A A
D D
4
C C
E E
ES Flue Installation Manual

Advertisement

Table of Contents
loading

Table of Contents