Component Testing; Ignition Switch - Toro Groundsmaster 4100-D Service Manual

Hide thumbs Also See for Groundsmaster 4100-D:
Table of Contents

Advertisement

Component Testing

For accurate resistance and/or continuity checks, elec-
trically disconnect the component being tested from the
circuit (e.g. unplug the ignition switch connector before
doing a continuity check).
NOTE: For engine component testing information, see
the Kubota Workshop Manual, Diesel Engine, V2003−T
Series at the end of Chapter 3 − Kubota Diesel Engine.

Ignition Switch

The ignition (key) switch has three positions (OFF, ON/
PREHEAT, and START). The terminals are marked as
shown. The circuit wiring of the ignition switch is shown
in the chart. With the use of a multimeter (ohms setting),
the switch functions may be tested to determine whether
continuity exists between the various terminals for each
position. Verify continuity between switch terminals.
POSITION
OFF
ON / PREHEAT
START
Electrical System
CIRCUIT
NONE
B + I + A, X + Y
B + I + S
When testing electrical components for continu-
ity with a multimeter (ohms setting), make sure
that power to the circuit has been disconnected.
4
1. Key
2. Hex nut
Page 5 − 10
CAUTION
A
B
Y
S
X
I
Figure 8
2
3
Figure 9
3. Lock washer
4. Ignition switch
OFF
45 °
ON / PREHEAT
45 °
START
Figure 10
Groundsmaster 4100−D
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

30411

Table of Contents