Operation; Compatible Machines - Toro TransPro 200 Installation Instructions Manual

Tow-behind trailer
Table of Contents

Advertisement

Installing the Trailer Tongue to the
Main Frame
1.
Use 2 bolts (7/16 inch), 4 washers, and 2
locknuts to secure the trailer tongue to the main
frame
(Figure
23).
The trailer tongue must be parallel to the ground
when the trailer is attached to the tow vehicle.
Ensure that the tongue is parallel to the ground
before you torque the hardware.
Figure 23
1. Locknut
2. Washer
2.
Torque the hardware to 95 N∙m (70 ft-lb).
g338045
3. Trailer tongue
4. Bolt (7/16 inch)

Operation

Compatible Machines

This trailer is designed to be configured for the
following walk-behind Greensmaster machines
without the need for additional kits:
Machine
Greensmaster 1018
Greensmaster 1021
Greensmaster Flex 1018
Greensmaster Flex 1021
Greensmaster e1021
Greensmaster eFlex 1021
This trailer can be configured for the following
walk-behind Greensmaster machines with an
additional configuration kit (sold separately):
Greensmaster Flex 18/21 series
Greensmaster Flex 1800/2100 series (including
eFlex)
Greensmaster 800/1000 series
Contact your authorized Toro distributor for more
information.
9
Model
04820
04830
04850
04860
04831
04861

Advertisement

Table of Contents
loading

This manual is also suitable for:

042190422904239

Table of Contents