Installation - Bryant 935CA Installation, Start-Up, Operating And Service And Maintenance Instructions

Single-stage, upflow/horizontal communicating, variable speed ecm, ultra low nox, 35-in tall condensing gas furnace
Table of Contents

Advertisement

935CA: Installation, Start-up, Operating and Service and Maintenance Instructions
NOTE: Coil may require metal spacer or shield between furnace and
coil. See coil install requirements, see
Fig. 11 – Example of Field Drain Attachment
Table 5 – Condensate Trap Configurations
Part
Horizontal
Required
A200090
Main Trap
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
Table
6.
Installation Configuration
Upflow
Upflow
Offset
Required
Required
Table 5 – Condensate Trap Configurations (Continued)
A200091
Adapter
A200092
Plate
A200073
A200093
Offset Adapter
Upflow installations utilizing the right side air return o
Upflow installation utilizing the right side air return opening should
follow the Upflow Specific Steps - Offset Installation to ensure the full
opening is available for return ductwork

INSTALLATION

Preparing the Furnace – Before Setting in Place
1. Remove appropriate knockout based off the installation orientation.
A200074
CUT HAZARD
Failure to follow this caution may result in personal injury.
Sheet metal parts may have sharp edges or burrs. Use care and wear
appropriate protective clothing, safety glasses and gloves when
handling parts, and servicing furnaces.
2. Remove two of the factory-installed drain plugs from collector box.
Orientation specific drain plugs, see
3. Check that all pre-installed gaskets on trap components are present,
adhered, and undamaged.
12
Not
Required
Required
Not
Required
Required
Not
Not
Required
Required
NOTICE
!
CAUTION
!
Fig. 12 – Knockout Removal
Fig.
13.
Required
Required
Required
(accessory kit
purchased
separately)
L12F019B

Advertisement

Table of Contents
loading

Table of Contents