Electrical Test Instruments PI-6000
Section IV - Operating Instructions
==============================================================================
PRE-TEST INSTALLATION AND SET-UP
1.
The following components of the test set should be available and in good
condition:
a) PI-6000 Main Unit
b) MAC-21
c) Stab set to match breaker to be tested
d) Input power plugs and cables
e) Input ground lead
f) Auxiliary ground lead
g) MAC-21 control cable
h) Contact lead set (If applicable)
i) Remote initiate cable (optional)
2.
Additional requirements for testing are as follows:
a) Breakers to be tested
b) Manufacturers' curve data
c) Test log and/or report forms (See examples at end of section)
d) Basic hand tools (wrench, screwdriver, etc.)
e) Safety equipment (safety glasses, gloves, etc.)
f) Reliable and sufficient power source
g) Clean, spacious, and well-lit work area.
3.
The voltage selector must be set to match input voltage.
4. Calculate KVA requirements for the source per manufacturer's manual.
5.
Locate a suitable earth ground and connect it to the Main Control Unit
with at least #6 AWG wire.
6.
Connect the Ground Integrity binding post separately to earth ground.
7.
Open hood cover, exposing MAC-21 and indicator control panel.
8. If possible, TURN OFF power at source.
==============================================================================
Copyright(C) 1994-2019
SECTION IV
OPERATING INSTRUCTIONS
Electrical Test Instruments, LLC
All Rights Reserved