Erection of the switchgear on site
5
In the interests of the best possible erection
sequence, and in order not to endanger the high
quality standard of the ZS1 switchgear, local
erection should only be carried out, or at least
responsibly managed and supervised, by specially
trained skilled personnel.
5.1
Site requirements
On commencement of installation at site, the
switchroom must be completely finished, provided
with lighting and site electricity supply, lockable, dry
and with facilities for ventilation. All the necessary
preparations such as wall openings, ducts, etc. for
laying of the power and control cables up to the
switchgear must already be complete. Where
panels have top-mounted structures for earthing
switches or instrument transformers, it must be
ensured that the ceiling height is sufficient for the
opening travel of the pressure relief flaps.
The ceiling height is also to be checked when there
is a top-mounted pressure relief duct.
Compliance with the conditions for indoor
switchgear to VDE 0670 part 1000/IEC 60694,
including the conditions for the „minus 5 indoor"
temperature class must be ensured.
Dimension chart of structural data
(See also figures 5/1 to 5/4)
Panel dimensions
Minimum dimensions
in the switching room
1)
Upright transport of panels with a height of 2200 mm.
2)
Pay attention to VDE 0101
ABB Power Distribution
5.2
[mm]
Width
Depth
1)
[mm]
Door height
Door width
2)
Aisle width
Assembly opening
in ceiling:
• Width
• Length
Foundations
(Figures 5/1 to 5/5)
The switchgear is preferably to be erected on a
foundation frame set into the switchroom floor or
on a raised false floor.
The guideline structural data listed below facilitate a
rough calculation of the space required and
preliminary planning of the room design for a
switchgear project. When the final construction
documents are compiled, the binding data
supplied by ABB Calor Emag must always be taken
into account!
The stipulations of DIN 43 661 are also to be
complied with when the foundation is laid. This
particularly
applies
to
straightness tolerances of the switchgear.
Note:
The construction data for the ceiling openings for
incoming conductors do not aply to trunking bars
without earthed coatings. Broader ceiling openings
are required in such cases.
650
800
1300
1300
2400
2400
850
1000
1350
1500
1000
1000
1500
1500
the
evenness
and
1000
1300
1350
2400
2400
1200
1200
1700
1700
1200
1200
1500
1500
23