Crate Breakdown Procedures - Trane Thermo King T-590 Series Installation Manual

Self-powered truck edition single temperature systems
Table of Contents

Advertisement

Crate Breakdown Procedures

Follow these steps after unit has been removed from crate:
1. Remove mounting posts by rotating twist-lock handle to U U P P position, then pulling straight up.
a. Slide each post into retaining channels located on crate base.
b. Rotate twist-lock handle to secure posts to channels.
N N o o t t e e : : Mounting posts m m u u s s t t be secured to retaining channels for shipment.
2. Fold down front and rear supports by sliding locking rings U U P P until they rest on tab, then fold each support member
down flat.
3. Crate is now ready to return.
1
7
6
1.
Rear Support Member
2.
Mounting Posts (X2)
3.
Retaining Channels (X2)
4.
Front Support Member
5.
Forklift Pockets (X2)
TK 56700-1-IM-EN
Figure 1. Returnable Create Components Shown
2
5
9
6.
7.
8.
9.
R R e e t t u u r r n n a a b b l l e e S S t t e e e e l l C C r r a a t t e e I I n n f f o o r r m m a a t t i i o o n n
4
3
RCS1098-2
Locking Rings (X4)
Twist Locks (X2)
Mounting Post Secured to Retaining Channels
Crate Shown Ready to Return
8
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thermo king t-690 seriesThermo king t-890 seriesThermo king t-1090 seriesThermo king t-1090Thermo king t-1090 maxThermo king t-590 model 30 ... Show all

Table of Contents