Central Heating; Setting Time Phases - Viessmann VITOLIGNO 300-C Operating Instructions For The System User

Pellet boiler, 60 to 101 kw, with weather-compensated ecotronic boiler and heating circuit control unit
Table of Contents

Advertisement

Time program
(cont.)
For central heating, up to 4 changes between stand-
ard and reduced room temperature can be program-
med per day (4 time phases).
At the factory, time phase
is set for all days of the week. During that time, the
rooms are heated to the standard room temperature.
You can set switching times individually for the fol-
lowing days or parts of the week:
The same for every day: Monday to Sunday
For individual parts of the week: Monday to Friday
and Saturday to Sunday
For every day individually: Monday, Tuesday, etc.
In the "Extended menu", you can call up the current
time program under "Information" (see page 38).

Setting time phases

Heating time program
Monday-Sunday
Monday-Friday
Saturday-Sunday
Monday
Select with
Fig. 14
Press the following keys:
1.
for the "Extended menu".
å
2.
/
for "Heating".
|
~
3.
to confirm.
d
4.
/
to select "Heating circuit 1" (HC1), "Heat-
Ù
Ú
ing circuit 2" (HC2), "Heating circuit 3"
(HC3) or "Heating circuit 4" (HC4, if
installed).
5.
/
for "Heating time program".
|
~
6.
to confirm.
d
7.
/
until the required part of the week or day
|
~
appears.
Deleting a time phase
1. Set the time for the end point to the same time that
was set for the start point.
The display shows "- - : - -".
2. Press
to confirm.
d
from 06:00 to 22:00 h
!
HC1
Please note when setting the switching times: Your
heating system needs some time to heat rooms to the
required temperature.
Note
For the period between the specified switching times,
the relevant heating circuit is regulated to the standard
room temperature.
8.
to confirm.
d
9.
/
to select the time phase.
|
~
The relevant time phase is represented by
a number (
!
Heating
0
2
4
6
8 10 12 14 16 18 20 22 24
06:00 - 22:00
!
? - -:- - - - -:- -
Select with
Fig. 15
10.
to confirm.
d
11.
/
to set the start point.
|
~
12.
to confirm.
d
13.
/
to set the end point.
|
~
14.
to confirm.
d
15. To set the beginning and end of further time pha-
ses, proceed as described in steps 9 to 14.
Heating
Mo-Fr
HC1
0
2
4
6
8 10 12 14 16 18 20 22 24
- -:- - - - -:- -
Std
?
u
- -:- - - - -:- -
Std
§
u
Adopt with
OK
Fig. 16

Central heating

,
,
or
).
?
§
$
Mo-Su
HC1
Std
u
---
u
(
19

Advertisement

Table of Contents
loading

Table of Contents