Reset Button; Hardware Installation; Sim Card Installation; Ethernet Cable & Power Cable Installation - LINOVISION IOT-G65 Quick Start Manual

Lorawan gateway
Table of Contents

Advertisement

Ethernet
ETH
Port Status

2.4 Reset Button

Description
Function
STATUS LED
Static Blue
Static Blue →
Reset
Rapidly Blinking
Off → Static Blue

3. Hardware Installation

3.1 SIM Card Installation

IOT-G
65 does not support hot plugging, please turncut off the power before you
insert or take off cards.
A. Use screwdriver to Open the protective cover on the back panel of IOT-G65 via
screwdriver.
B. Push Insert the SIM card into the device according to the direction the icon on the device.
Note: If you need to take out the SIM card, press into the SIM card and it will pop up
automatically.
3.2 Ethernet Cable & Power Cable Installation
A. Connect the Ethernet cable and power cable to corresponding interfaces.
B. Pass two cables through the waterproof silicone and slid into the grooves.
C. Screw the protective cover back to the device.
Static: SIM card has been registered and dialed up
successfully
Off
Disconnected
Blue Light
Static: Connected
Action
Press and hold the reset button for more than 5 seconds.
Release the button and wait.
The gateway resets to factory default.

Advertisement

Table of Contents
loading

Table of Contents