Two-Post Flush-Mount Installation - Dell EMC PowerSwitch S5148F-ON Installation Manual

Hide thumbs Also See for EMC PowerSwitch S5148F-ON:
Table of Contents

Advertisement

Figure 9. 1U tool-less nonthreaded square hole installation
2. Align and seat the front flange pegs in the holes on the front side of the vertical post.
NOTE:
Be sure that the rails click into place and are secure.
3. Repeat this procedure for the second rail.
To remove each rail, pull on the latch release on each flange ear and unseat each rail.

Two-post flush-mount installation

NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
CAUTION:
Your switch is not NEBS Earthquake Z4-compliant if you this installation method.
1. For this configuration, remove the castings from the front side of each ReadyRails assembly, see item 1. Use a Torx
screwdriver to remove the two screws from each front latch on the switch side of the rail. Remove the tool-less latch
casting. Retain the castings for future rack requirements. Do not remove the back latch castings.
20
S5148F-ON switch installation

Advertisement

Table of Contents
loading

Table of Contents