Huawei PDC-0038V4ACIOA-V2 Quick Installation Manual page 7

Table of Contents

Advertisement

Connect cables.
Device
PDU
3 kVA /6 kVA UPS
 Connecting cables to the PDU for UPS2000-G-3 kVA/6 kVA system (dual-live-wire input dual-live-wire output).
1.
Configure colors for the cables prepared onsite in accordance with the local regulations.
2.
Connect cables in this sequence: AC output power cables, AC input power cables, and battery cables.
1.
Before connecting cables, set off the mains circuit breaker, output circuit breaker, bypass circuit
breaker, maintenance bypass switch, and battery circuit breaker.
2.
The 2-pole circuit breakers of K1 and Q1 used for cable connection are provided by the user.
3.
For the cable connection of single-phase, see the dual–live wire connection method.
4.
If customers purchase input and output power cables by themselves, use the cables that comply
with standards proposed by Underwriters Laboratories (UL) or International Electrotechnical
Commission (IEC).
Connecting cables to UPS2000-G-3 kVA or UPS2000-G-6 kVA without transformer
(Dual-live-wire input Dual-live-wire output)
Tool
Power screwdriver
6
Screw
Torque
M5X0.8p
1.5 N·m
M4X0.7p
1.3 N·m
PDU
UPS

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r001c11

Table of Contents