Table Of Contents - Mitsubishi Electric PLK-J3020R-SE Technical Manual

Industrial sewing machine
Table of Contents

Advertisement

CONTENTS
1. STRUCTURE OF THE SEWING MACHINE····································
2. SPECIFICATIONS·····································································
3. INSTALLATION········································································
3-1. Preparation of the table··········································································
3-2. Preparation of the steel stand··································································
3-3. Installation of the control box···································································
3-4. Installation of the operation panel·····························································
3-5. Installation of the power switch and foot switch············································
3-6. Installation of the oil pan·········································································
3-7. Installation of the machine head·······························································
3-8. Installation of gas spring·········································································
3-9. Installation of the tilting detect switch························································
3-10. Connection of the electric cables····························································
3-10-1. How to remove the motor cover························································
3-10-2. Connection of the PF axis cables······················································
3-10-3. Connection of the XY axis cables······················································
3-10-4. Connection of the main servo and sub servo motor cables·····················
3-10-5. Connection of the I/F board cables····················································
3-10-6. Connection of the optional output connector········································
3-10-7. Fixing of the cables········································································
3-11. Connection of the air tube·····································································
3-11-1. Installation of the filter regulator and air piping·····································
3-11-2. Piping of the oil drainage tube··························································
3-12. Installation of the thread stand·······························································
3-13. Installation of the eye guard···································································
4. LUBRICATION·········································································
4-1. Filling the oil tank·················································································· 18
1
2
3
3
4
4
4
4
5
5
6
7
8
9
9
10
11
12
13
13
14
14
15
17
17
18

Advertisement

Table of Contents
loading

Table of Contents