Single-channel, 8-channel, and 12-channel pipettors (26 pages)
Summary of Contents for HTL HTL-SIM
Page 1
OPERATING INSTRUCTIONS HTL-SIM Run Down Simulator...
Page 2
CONTENTS Contents Safety Warranty General overview Operation Maintenance Spare parts Declaration Notes 9-11 Contact us SAFETY Please read this manual before operating the equipment. This unit must only be used for the intended purpose of calibrating pneumatic and/or electronic torque tools. Prior to commencement, ensure that: •...
Page 3
HTL Group Ltd, this guarantee is rendered null and void. In the event of a warranty claim, return the equipment to HTL Group Ltd or the authorised dealer which sold you the hydraulic equipment. HTL Group Ltd will repair or replace the faulty equipment, whichever is deemed most appropriate.
Page 4
OPERATION Place TTT box onto mounting shelf as shown in the image below. Insert cable from TTT box through the guard and connect to the transducer. Connect the TTT box to power and switch on. Insert desired hex adaptor into the 1.1/2” input square. Place the correct size socket onto the tool to be calibrated.
Page 5
MAINTENANCE The soft joint simulation should be serviced every 50,000 cycles by HTL Group Ltd or the authorised dealer which sold you the equipment.
Page 6
CONTACT US HTL Group Corporate Headquarters 45 Colbourne Avenue Nelson Park Industrial Estate Cramlington Northumberland NE23 1WD Phone: +44 (0) 1670 700 000 Email: info@htlgroup.com HTL Europe b.v HTL Australasia Pty Ltd Euroweg 30 466 Victoria Road NL-2988 CM Ridderkerk...
Need help?
Do you have a question about the HTL-SIM and is the answer not in the manual?
Questions and answers