Gas Components Table - B+S Verro Series Installation And User Instructions Manual

Hide thumbs Also See for Verro Series:
Table of Contents

Advertisement

The commissioning of appliances shall include all of the following, as required by AS5601.1:2010;
(a) - Testing and purging of the appliance and installation as appropriate.
(b) - Checks to ensure the appliance is in safe working order.
(c) - Ignition of each burner of the appliance, and where necessary adjustment in accordane with
manufacturers instructions.
(d) - Testing of flue performance.
(e) - Testing of all safety devices for correct operation.
(f) - Instruction of the consumer, where available, on the safe and correct operation of the appliance and any
auxiliary equipment.
(g) - Handing of the appliance operating instructions to the consumer, or if the consumer is not present,
leaving the instructions in a suitable location on the permises.
Ensure unit has been leveled prior to finalising commissioning. This unit is also available as plinth, cantilever
and rear locking castor wheels. When the unit has rear locking castor wheels, front legs must be adjusted to
level the unit.
Injector Sizes;
Size
NC6
460mm
NC9
600mm
Gas Components;
Part
Regulator
Thermocouple
Gas Cock Flame Failure
Pilot
NC Ribbon Burner
8
Gas Type
Burner Injector Size
Natural
1.85mm
LPG
1.05mm
Natural
1.95mm
LPG
1.15mm
Manufacturer
Model No.
Maxitrol
RV48LSM-66/PF10
Oara
980 (NG)
986 (LPG)
SIT
0200009
Robertshaw
1970
Alpha Brass
A62
PEL Pintossi
22S
Alpha Brass
A63
PEL Pintossi
23S
Alpha Brass
B23-1H15
Keefer
KG-14
MJ/h
Pilot Injector Size
58 MJ/h
0.35mm
50 MJ/h
0.25mm
90 MJ/h
0.35mm
75 MJ/h
0.25mm
Approval Number
AGA 3088
AGA 5862
AGA 7467
AGA 4062
AGA 7467
AGA 4062
© B&S Commercial Kitchens Pty Ltd 2016
Test Point Pressure
1.00 kPa
2.60 kPa
1.00 kPa
2.60 kPa
Notes
A63C, A63V
Drawing B23-1H15
G0080

Advertisement

Table of Contents
loading

Related Products for B+S Verro Series

Table of Contents