Further details regarding the individual steps
Venting the boiler
A
Venting the heating system
1. Start the control unit.
Commissioning, inspection, maintenance
1. Close the shut-off valves on the heat-
ing water side.
B
2. Connect the drain hose between top
valve B and a drain outlet.
3. Open valves A and B and vent
using mains pressure until no more
air noise is audible.
4. Close valves A and B and open
the heating water shut-off valves.
(cont.)
9