Commissioning, inspection, maintenance
Further details regarding the individual steps
9. Seal test connector A again with the
previously removed plug.
Cleaning the burner
B
D
C
A
1. Undo nuts, remove the lid with mixer
equipment A and secure in the
maintenance position.
2. Pull the leads off ignition electrodes
B.
18
(cont.)
Note
Do not seal the connector next to test
connector A.
3. Undo Allen screw C and remove
rifling facility D.
4. Clean the restrictor, dosing ring and
ignition electrodes.