Dunkirk DMG-240 Installation, Operation & Maintenance Manual page 9

Condensing gas fired boiler
Table of Contents

Advertisement

FIGURE 4-1a Clearance to Combustible Materials
(See Table 2, page 8)
A
0" (0mm)
B
1-3/4"
(45mm)
Boiler Front
F
0" (0mm)
F L O O R
FIGURE 4-1b Clearance to Combustible Materials
Boiler Left Side View
E
0" (0mm)
E
0" (0mm)
F
0" (0mm)
F L O O R
4 - LOCATING BOILER
A
0" (0mm)
C
1-3/4"
(45mm)
View
F
0" (0mm)
A
0" (0mm)
D
1-3/4"
(45mm)
F
0" (0mm)
FIGURE 4-2a Service Clearances - Boiler Front
(See Table 2, page 8)
FIGURE 4-2b Service Clearances - Boiler Left side
FIGURE 4-2c Service Clearances - Closet Installation
CLEARANCES REQUIRED FOR CLOSET
INSTALLATION
1 3/4 "
( 400 mm)
CLOSET INSTALLATION
0 in. /0 mm between the Back of the Unit and the wall
9
Boiler
Front View
17 3/4 "
( 450 mm)
17 3/4 "
Boiler Left
( 450 mm)
Side View
Minimum Service
clearance to front
of boiler
BACK
1 3/4 "
( 400 mm)
TOP VIEW
1 3/4 "
( 400 mm)
P/N 240011656, Rev. E [07/30/2018]