Dunkirk DMG-240 Installation, Operation & Maintenance Manual page 33

Condensing gas fired boiler
Table of Contents

Advertisement

FIGURE 6-23 Secure Clamp around Flue Adapter
FIGURE 6-24 Maximum Distance Between Supports
Horizontal
6 - COMBUSTION AIR AND VENT PIPING
Vertical
5.
Connect end cap and condensate trap to horizontal
common vent pipe. See Figure 6-22.
6.
Connect 90° elbows to horizontal common vent pipe for
each boiler in cascade system
7.
Connect flue damper to 90° elbow for each boiler in
cascade system.
8.
Connect boiler flue adapter to flue damper for each boiler
in cascade system. Ensure flue adapters allow for 3° or
2 in. per 3 ft. slope of horizontal collectors back towards
condensate collector.
9.
Connect intake air screen to flue adapter for each boiler in
cascade system. Combustion air shall come from indoors
only.
10.
Connect cascade vent system to flue connection on top of
boilers.
11.
Secure flue adapters using approved clamps to wall.
Ensure clamps are connected minimum of 10 in. from top
of boiler. See Figure 6-23.
12.
Secure approved clamp around flue adapter. Ensure clamp
is locked in to proper position. See Figure 6-23.
A. Position 1 - Clamping around bell end of adapter.
B. Position 2 - Clamping around flue pipe adapter.
13.
Maximum distance between supports for horizontal pipes
3 ft 4 in. Maximum distance between supports for vertical
pipes 6 ft 7 in. See Figure 6-24.
14.
Fully tighten horizontal common vent pipe supports.
33
P/N 240011656, Rev. E [07/30/2018]

Advertisement

Table of Contents
loading

Table of Contents